My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002 - JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002 - JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:46:56 PM
Creation date
7/3/2020 10:48:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002 - JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
953
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 MEETINGS <br />In order to facilitate construction of the final cover system, close coordination between <br />the Project/Construction Manager, Landfill Engineer, Geotechnical CQA Consultant, <br />Contractor (including appropriate Subcontractors) and Geoteclulical CQA personnel is <br />essential. To this end, the following meetings are typically scheduled: <br />4.1 PRE -CONSTRUCTION MEETINGS <br />A Pre -construction Meeting will be held at the site. At a minimum, the meeting <br />should be attended by the Owner (or designated representative), the Construction <br />Manager, the Landfill Engineer, the Geotechnical CQA Consultant (or designated <br />representative), the Contractor and appropriate Geotechnical CQA staff. <br />In addition to the typical contract related agenda items, the following CQA <br />specific items may also be reviewed: <br />• Any appropriate modifications to the Geotechnical CQA requirements. <br />• Development of a format for site specific documentation. <br />• Review of the CQA responsibilities of each individual or fine. <br />• Review of the lines of CQA authority and communication. <br />• Review of work area security and safety protocol. <br />• Review of the procedures for CQA project documentation and reporting, and <br />distribution of documents and reports. <br />0 • Review of procedures for CQA submittals. <br />• Review of the Contractor's proposed methods of construction, (including <br />equipment), with specific emphasis on the methods of select grading, soil <br />mixing, stockpiling, processing, moisture conditioning and compaction. <br />• Review of the procedures for field and laboratory CQA testing. <br />• Establishment of procedures for correcting and documenting construction <br />deficiencies. <br />• Conducting an initial site inspection to discuss work areas, stockpile areas, <br />mixing tables, laydown areas, access roads, haul roads, and related items. <br />The meeting shall be documented by the Construction Manager and minutes shall <br />be distributed to all parties. <br />4.2 PROGRESS MEETINGS <br />Progress Meetings shall be held in accordance with the Project Specifications. At <br />a minimum, these meetings should be attended by the Owner (or designated <br />representative), the Construction Manager, the Geotechnical CQA Officer and/or <br />the Geotechnical CQA Monitors, and the Contractor. Progress meetings shall be <br />documented by the Construction Manager or his/her representative and minutes <br />shall be distributed to all parties. The purpose of these meetings is to: <br />-9- <br />CA2001-048TINALCOVER CQA.D0C\08/20/01 <br />Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.