My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002 - JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002 - JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:46:56 PM
Creation date
7/3/2020 10:48:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002 - JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
953
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following table lists the minimum moisture/density requirements for <br />iscompacted fill materials placed. The in-place moisture content and dry density <br />requirements are relative to the maximum dry density and optimum moisture <br />content as determined by ASTM D1557. <br />5.4.3 LIFT THICKNESS AND PROCESSING <br />If at any time the CQA Monitor observes an uncompacted lift thickness in excess <br />of eight inches or observes material being placed without meeting the <br />requirements for processing, stockpiling and curing, the Contractor shall <br />immediately discontinue placing additional fills in that area. For an over thick lift, <br />the Contractor shall immediately blade the surface to reduce the lift thickness to <br />the Project Specifications prior to compaction. If inadequately mixed materials <br />are placed, the Contractor shall immediately remove these materials and return <br />them to the stockpile/processing area where they will be reprocessed. <br />5.4.4 GEOSYNTHETIC MATERIAL SUBGRADE <br />The CQA Monitor, the Contractor and the Geosynthetic installer will observe and <br />approve the geosynthetic material subgrade prior to material deployment. The <br />finished surface shall be free of abrupt breaks, sharp objects, or other foreign <br />material that may damage the overlying geosynthetic. The subgrade shall be <br />unyielding, smooth and uniform and the surface shall not be pebbly or tracked and <br />rutted by equipment. <br />6.0 GEOTECHNICAL CQA MONITORING FOR GEOSYNTHETICS <br />Lei a oil V V <br />The Contractor/Liner Manufacturer shall provide the Construction Manager with <br />the following documentation: <br />• A properties sheet which includes all specified properties measured using test <br />methods indicated in the Specifications. <br />• A description of the sampling procedure and appropriate test results. <br />• A certification that values given in the properties sheet are guaranteed by the <br />Liner Manufacturer. <br />-12- <br />CA2001-048TIN.A L CO V ER_CQA.DOC\08/20/01 <br />Geologic Associates <br />MOISTURE <br />CONTENT <br />Optimum ± 2% <br />Optimum ± 2% <br />FILL TYPE MINIMUM COMPACTION <br />(percent) <br />Foundation Soil Layer 90 <br />Vegetative Soil Layer 90 <br />5.4.3 LIFT THICKNESS AND PROCESSING <br />If at any time the CQA Monitor observes an uncompacted lift thickness in excess <br />of eight inches or observes material being placed without meeting the <br />requirements for processing, stockpiling and curing, the Contractor shall <br />immediately discontinue placing additional fills in that area. For an over thick lift, <br />the Contractor shall immediately blade the surface to reduce the lift thickness to <br />the Project Specifications prior to compaction. If inadequately mixed materials <br />are placed, the Contractor shall immediately remove these materials and return <br />them to the stockpile/processing area where they will be reprocessed. <br />5.4.4 GEOSYNTHETIC MATERIAL SUBGRADE <br />The CQA Monitor, the Contractor and the Geosynthetic installer will observe and <br />approve the geosynthetic material subgrade prior to material deployment. The <br />finished surface shall be free of abrupt breaks, sharp objects, or other foreign <br />material that may damage the overlying geosynthetic. The subgrade shall be <br />unyielding, smooth and uniform and the surface shall not be pebbly or tracked and <br />rutted by equipment. <br />6.0 GEOTECHNICAL CQA MONITORING FOR GEOSYNTHETICS <br />Lei a oil V V <br />The Contractor/Liner Manufacturer shall provide the Construction Manager with <br />the following documentation: <br />• A properties sheet which includes all specified properties measured using test <br />methods indicated in the Specifications. <br />• A description of the sampling procedure and appropriate test results. <br />• A certification that values given in the properties sheet are guaranteed by the <br />Liner Manufacturer. <br />-12- <br />CA2001-048TIN.A L CO V ER_CQA.DOC\08/20/01 <br />Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.