My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002 - JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002 - JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:46:56 PM
Creation date
7/3/2020 10:48:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002 - JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
953
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Observe that adjacent panels of geocomposite are overlapped a minimum of <br />18 inches where the fabric is not seamed (welded or sewn). When seamed, a <br />three (3) -inch minimum overlap will be required. <br />The Geotechnical CQA Monitors shall inform both the Contractor/Liner <br />Subcontractor and the Geotechnical CQA Officer if the above minimum <br />conditions are not met. <br />The Contractor/Liner Subcontractor shall provide the Construction Manager with <br />a panel layout plan, and shall update this plan daily as the job proceeds. No <br />geocomposite shall be placed until the panel layout plan has been approved by the <br />Construction Manager. During geocomposite placement, the Geotechnical CQA <br />Monitors shall observe that: <br />• The geocomposite is cut only with an approved cutter, and is not torn or <br />ripped. <br />• Geocomposite seaming equipment meet the Project requirements. <br />• The panels are being overlapped or joined in accordance with the Project <br />Plans and Specifications. <br />• Any damaged roll of geocomposite is removed and replaced. <br />6.2 GEOMEMBRANE (VFPE) <br />Delivery of geomembrane to the site will not be allowed until all required <br />documentation and/or certifications are approved by the CM/Geotechnical CQA <br />Team. It is the responsibility of the Contractor/Subcontractor to ensure that all <br />required documentation and/or certifications are approved prior to shipment. <br />6.2.1 VFPE MANUFACTURING <br />Prior to the delivery of any geosynthetic material, the Liner Manufacturer shall <br />provide the Construction Manager with the following: <br />• A properties sheet for the rolls to be delivered including all specified <br />properties measured using test methods indicated in the specifications. <br />• The sampling procedure and results of testing. <br />• A certification for each roll stating that property values given in the properties <br />sheet are guaranteed by the Liner Manufacturer. <br />• The Geotechnical CQA Officer shall verify that: <br />— The property values certified by the Liner Manufacturer meet the project <br />specifications. <br />— The measurements of properties by the Liner Manufacturer are properly <br />documented and that the test methods used are acceptable. <br />-16- <br />CA2001-048TINAL COVER CQA.DOC\08/20/01 <br />Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.