My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002 - JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002 - JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:46:56 PM
Creation date
7/3/2020 10:48:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002 - JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
953
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.2.3.2 Sampling and Testing Frequency <br />Unless otherwise specified, conformance samples shall be taken and tested at a <br />rate of one per lot or one per 100,000 square feet, whichever results in the greater <br />number of tests. <br />6.2.3.3 Sampling Procedures <br />Samples shall be taken across the entire width of the roll and shall not include the <br />first three feet. Unless otherwise specified, samples shall be 3 feet long by the <br />roll width. The Geotechnical CQA Monitors shall mark the machine direction on <br />the samples with an arrow, and the Liner Manufacturer's roll identification <br />number. <br />6.2.3.4 Test Results <br />The results of Conformance Testing will be documented on appropriate forms. <br />The Geotechnical CQA Officer shall examine all conformance test results and <br />shall report any non-conformance to the Construction Manager, the Contractor <br />and the Lining Subcontractor. <br />The Geotechnical CQA Officer shall examine all results from the laboratory <br />conformance testing. All specimens tested shall pass. If any specimen fails, the <br />entire sample shall be considered as a failure and rejected. In this event, the <br />material represented by the sample shall be considered nonconformant with the <br />Specifications, and corrective measures shall be implemented. Corrective <br />measures shall include a rerun of the conformance testing using a portion of the <br />same sample. If the second test passes, the Geotechnical CQA Officer may <br />assume an error was made in the first test and the VFPE material can be accepted. <br />If the second test fails, the Liner Subcontractor shall remove all material <br />represented by the sample from the work area. <br />All conformance test results must be approved by the Construction Manager prior <br />to the VFPE represented by the test being approved for deployment/installation. <br />The decision of the Construction Manager shall be final. <br />6.2.4 VFPE INSTALLATION <br />6.2.4.1 Earthwork <br />Surface Preparation <br />The Contractor shall be responsible for preparing the supporting soil according to <br />the Project Specifications prior to installation of the VFPE. <br />-19- <br />C A2001-038TINAL COVER CQA.DOC\O8/20/01 <br />Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.