Laserfiche WebLink
Consolidated Forward Landfill Project - Mitigation Monitoring and Reporting Program Checklist <br />Mitigation Measure Implementation <br />MITIGATION MONITORING AND REPORTING PROGRAM CHECKLIST <br />Monitoring <br />Page 31 <br />Implementation <br />Confirmation Comments <br />INTRODUCTION: This Mitigation Monitoring and Reporting Program Checklist includes mitigation measures identified in this EIR, as well as mitigation <br />measures from three previous EIRs prepared for the project site, identified below as "Forward 1993", "Austin 1994", and "Austin 2000". These three previous <br />EIRs are discussed in more detail in the introduction to Attachment I Mitigation Measures, above. <br />Mitigation measures are grouped by the impact categories used in this EIR, and numbered sequentially. <br />Mitigation Measures from this EIR are printed in normal font, with the original Mitigation Measure numbers from this EIR following in (parentheses). <br />Mitigation measures from the three previous EIRs are printed in italics and identified by their source (Forward 1993, Austin 1994, or Austin 2000), followed <br />by the Mitigation Measure number in the relevant EIR. Because some impacts in this EIR and in previous EIRS do not require mitigation measures, the <br />original mitigation measure numbers are not sequential. <br />In some cases, mitigation measures from two or more of the previous EIRs that are substantially similar in content, or have been updated without otherwise <br />being changed, have been combined. These mitigation measures are identified as "similar" and/or "updated". Mitigation measures from the three previous <br />EIRs that have been replaced by equivalent measures in this EIR, or have already been implemented, are excluded from the list below. <br />A. LAND USE, PLANS, <br />AND POLICIES <br />1 (A.3) Bird Hazards <br />Continue existing Responsibility: Landfill operator <br />bird control measures Timing: Ongoing <br />Limit surface of ponds Responsibility: Landfill operator <br />Timing: The area of proposed and <br />existing ponds shall be shown on any <br />grading permits submitted to the <br />County <br />Bird survey Responsibility: Landfill operator <br />Timing: Upon approval of Use Permit <br />and prior to approval of business license <br />Responsibility: San Joaquin County <br />Environmental Health Department <br />Timing: During monthly site visits <br />Responsibility: San Joaquin County <br />Environmental Health Department <br />Timing: During monthly site visits and <br />during 5 -year permit review <br />Responsibility: San Joaquin County <br />Environmental Health Department <br />Timing: Prior to approval of <br />business license <br />