Laserfiche WebLink
Consolidated Forward Landfill Project - Mitigation Monitoring and Reporting Program Checklist <br />Mitigation Measure Implementation <br />all sources exceeds 150 cfm) <br />13 (D.4) Dust control Responsibility: Landfill operator <br />operational measures Timing: Throughout life of project <br />Dust control (all- Responsibility: Landfill operator <br />weather entrance Timing: All-weather entrance road <br />road) shall be indicated on the <br />Improvement Plan <br />14 (D.5) Best Available Control Responsibility: Landfill operator <br />Measures Timing: Throughout life of project <br />15 Austin 1994 (GS.b), Austin 2000 (GS.b) <br />Mix or cover odorous Responsibility: Landfill operator <br />wastes Timing: Ongoing <br />16 Austin 1994 (GS.c), Austin 2000 (GS.c) <br />Efficient material Responsibility: Landfill operator <br />handling Timing: Ongoing <br />17 Forward 1993 (D1) <br />Balance dust control and <br />leachate generation <br />18 Forward 1993 (D2) <br />Revegetation <br />Responsibility: Landfill operator <br />Timing: Ongoing <br />Responsibility: Landfill operator <br />Timing: Ongoing <br />19 Austin 1994 (G1.b),Austin 2000 (G1.b) (similar) <br />Monitoring <br />release rate; implement when gas release <br />rate from all sources exceeds 150 cfm <br />Responsibility: San Joaquin Valley <br />Air Pollution Control District <br />Timing: Quarterly <br />Responsibility: San Joaquin Valley <br />Air Pollution Control District <br />Timing: Prior to approval of the <br />Improvement Plan <br />Responsibility: San Joaquin Valley <br />Air Pollution Control District <br />Timing: Quarterly <br />Responsibility: San Joaquin Valley <br />Air Pollution Control District <br />Timing: Quarterly <br />Responsibility: San Joaquin Valley <br />Air Pollution Control District <br />Timing: Quarterly <br />Responsibility: San Joaquin Valley <br />Air Pollution Control District <br />Timing: Quarterly <br />Responsibility: San Joaquin Valley <br />Air Pollution Control District <br />Timing: Quarterly <br />Page 35 <br />Implementation <br />Confirmation Comments <br />