Laserfiche WebLink
Consolidated Forward Landfill Project-Mitigation Monitoring and Reporting Program Checklist Page 42 <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation Comments <br /> Timing:Upon receipt of application Timing:Upon receipt of application <br /> for new well for new well <br /> 40(E.9) Implement Responsibility:See 31 (E.1)above Responsibility:See 31 (E.1)above <br /> Mitigation Timing:See 31 (E.1)above Timing:See 31 (E.1)above <br /> Measure E.1 <br /> Treatment of Responsibility: Landfill operator Responsibility:San Joaquin County <br /> contaminated soils Timing:Ongoing Environmental Health Department <br /> Timing:During monthly site visits <br /> 41 Austin 1994(L2.b) (updated),Austin 2000(L2.b) <br /> Household Hazardous Responsibility:Landfill operator Responsibility:San Joaquin County <br /> Waste Program Timing: Ongoing Environmental Health Department <br /> Timing:Annually <br /> 42 Forward 1993 (A.5) <br /> Hydrants and water Responsibility:Landfill operator Responsibility:San Joaquin County <br /> source Timing: Water source shall be shown on Environmental Health Department <br /> Improvement Plan Timing: Prior to approval of Improvement <br /> Plan <br /> 43 Forward 1993 (A.11) <br /> Balance ash control and Responsibility:Landfill operator Responsibility:San Joaquin County <br /> leachate generation Timing.Ongoing Environmental Health Department <br /> Timing.During monthly site visits <br /> F.HYDROLOGY AND WATER QUALITY <br /> 44(F.1) Drainage controls Responsibility:Landfill operator Responsibility:RWQCB <br /> Timing:Letter from RWQCB shall be Timing:Prior to issuance of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Channel reconfig- Responsibility:Landfill operator Responsibility:RWQCB <br /> uration and berms Timing:Letter from RWQCB shall be Timing:Prior to issuance of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br />