Laserfiche WebLink
Consolidated Forward Landfill Project-Mitigation Monitoring and Reporting Program Checklist Page 46 <br /> Implementation ' <br /> Mitigation Measure Implementation Monitoring Confirmation Comments <br /> 56(G.3)Modify seismic design Responsibility:Landfill operator Responsibility:RWQCB and CIWMB <br /> if needed Letters from RWQCB and CIWMB Timing:Prior to issuance of <br /> approving seismic design shall be Waste Discharge Requirements(WDRs) <br /> included with the Improvement Plan <br /> Monitor liner and Responsibility: Landfill operator Responsibility:RWQCB and CIWMB <br /> drainage system Timing:As determined by RWQCB Timing:Annually <br /> and/or CIWMB <br /> 57(G.4)Seismic design Responsibility:Landfill operator Responsibility:RWQCB and CIWMB <br /> requirements of Timing:Letters from RWQCB and CIWMB Timing:Prior to issuance of <br /> Title 27 approving seismic design shall be Waste Discharge Requirements(WDRs) <br /> included with the Improvement Plan and Solid Waste Facilities Permit(SWFP) <br /> 58(G.5)Implement erosion Responsibility:Landfill operator Responsibility:RWQCB <br /> management plan Timing:Daily Timing:Annually <br /> Revegetate completed Responsibility:Landfill operator Responsibility:RWQCB <br /> cells Timing:Upon completion of each cell Timing:Annually <br /> Erosion controls on Responsibility:Landfill operator Responsibility:RWQCB <br /> temporary slopes Timing: Upon construction of Timing:Annually <br /> temporary slopes <br /> Monitoring of erosion Responsibility:Landfill operator Responsibility:RWQCB <br /> control measures Timing:Daily,and for at least Timing:Annually,for at least <br /> five years after closure of cells five years after closure of cells <br /> 59 Forward 1993 (B.5) <br /> Assess groundwater Responsibility:Landfill operator Responsibility:RWQCB <br /> level after earthquake Timing:Within 24 hours of Timing: Within 24 hours of <br /> earthquake of V or greater earthquake of V or greater <br /> 60 Forward 1993 (B.6) <br /> Benchmarks to monitor Responsibility:Landfill operator Responsibility:RWQCB <br />