My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 2:52:25 AM
Creation date
7/3/2020 10:49:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002_2.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consolidated Forward Landfill Project-Mitigation Monitoring and Reporting Program Checklist Page 46 <br /> Implementation ' <br /> Mitigation Measure Implementation Monitoring Confirmation Comments <br /> 56(G.3)Modify seismic design Responsibility:Landfill operator Responsibility:RWQCB and CIWMB <br /> if needed Letters from RWQCB and CIWMB Timing:Prior to issuance of <br /> approving seismic design shall be Waste Discharge Requirements(WDRs) <br /> included with the Improvement Plan <br /> Monitor liner and Responsibility: Landfill operator Responsibility:RWQCB and CIWMB <br /> drainage system Timing:As determined by RWQCB Timing:Annually <br /> and/or CIWMB <br /> 57(G.4)Seismic design Responsibility:Landfill operator Responsibility:RWQCB and CIWMB <br /> requirements of Timing:Letters from RWQCB and CIWMB Timing:Prior to issuance of <br /> Title 27 approving seismic design shall be Waste Discharge Requirements(WDRs) <br /> included with the Improvement Plan and Solid Waste Facilities Permit(SWFP) <br /> 58(G.5)Implement erosion Responsibility:Landfill operator Responsibility:RWQCB <br /> management plan Timing:Daily Timing:Annually <br /> Revegetate completed Responsibility:Landfill operator Responsibility:RWQCB <br /> cells Timing:Upon completion of each cell Timing:Annually <br /> Erosion controls on Responsibility:Landfill operator Responsibility:RWQCB <br /> temporary slopes Timing: Upon construction of Timing:Annually <br /> temporary slopes <br /> Monitoring of erosion Responsibility:Landfill operator Responsibility:RWQCB <br /> control measures Timing:Daily,and for at least Timing:Annually,for at least <br /> five years after closure of cells five years after closure of cells <br /> 59 Forward 1993 (B.5) <br /> Assess groundwater Responsibility:Landfill operator Responsibility:RWQCB <br /> level after earthquake Timing:Within 24 hours of Timing: Within 24 hours of <br /> earthquake of V or greater earthquake of V or greater <br /> 60 Forward 1993 (B.6) <br /> Benchmarks to monitor Responsibility:Landfill operator Responsibility:RWQCB <br />
The URL can be used to link to this page
Your browser does not support the video tag.