Laserfiche WebLink
5.4.4.3 POST-CONSTRUCTION FINAL DOCUMENTATION <br /> At the completion of each phase of liner construction, a final report will be <br /> prepared to include: <br /> • Daily inspection summary reports. <br /> • Inspection data sheets. <br /> • Photographic reporting data sheets. <br /> • As-built reports. <br /> • Deviations from design and material specifications (with justifying <br /> documentation). <br /> A statement that the liner has been built in general conformance with the design <br /> specifications, the approved plans, and the approved modifications of the plans <br /> and specifications will be provided and included in the final documentation sent <br /> to the appropriate regulatory agencies. <br /> Forward Landfill JTD 5-32 <br /> L\Allied\2000.193\Reports\JTD-PCPCMP;02 Sec-5 0:5/24/02 <br /> Revision 1:07/16/02 <br /> BRYAN A.STIRRAT&ASSOCIATES <br />