• Verification that liner materials are as specified in the plans and specifications <br /> • or as approved by the engineer. <br /> • Observation of all phases of the liner construction and documentation of the <br /> contractor's compliance or noncompliance with the approved plans and <br /> specifications, and/or the directions of the engineer. Field tests and visual <br /> observations will be used to evaluate construction practices. <br /> • Accommodate seasonal conditions, if warranted. <br /> Testing Program <br /> A field testing program will be implemented during construction to evaluate <br /> whether all components are constructed according to the design specifications. <br /> All field tests will be conducted by CQA personnel or qualified laboratories <br /> under the supervision of the CQA personnel. <br /> Daily Recordkeeping and Reporting <br /> A summary report will be prepared daily by each technician with supporting <br /> inspection data sheets and records of any problems that occur or corrective <br /> • measures that are implemented throughout the construction period. Daily <br /> reports will include the following: <br /> • Date, name of project, and location. <br /> • Weather and site conditions. <br /> • Summary of any meetings conducted and the results of the meetings other <br /> than formal periodic meetings. <br /> • Location of daily construction activities and progress. <br /> • Record of equipment and personnel working areas. <br /> • Location of work being tested and areas passing final inspection. <br /> • Description and condition of any materials received at the site. <br /> • Record of equipment calibrations or recalibrations and any actions taken as a <br /> result of recalibration. <br /> • Site visits by others. <br /> • Identification of construction problems and their solution or disposition. <br /> • <br /> Forward Landfill JTD 5-29 <br /> L:\Allied\2000.193\Reports\]d:Sec-5.0:05/24/02 <br /> BRYAN A.STIRRAT S ASSOCIATES <br />