Forward Landfill will be accepting the maximum permitted tonnage of 46,080 <br /> tons/week and others where it may fall way below. Table 8 is presented to <br /> provide a rough estimation of the inflow to the Forward Landfill for permitting <br /> purposes. <br /> In addition, long-term landfill settlement can also have a great impact on site <br /> capacity and may average 25 percent of the total refuse thickness. The total <br /> effects of settlement will depend on various factors or processes such as the <br /> types of refuse placed and their corresponding moisture content, the refuse <br /> placement density, consolidation of the refuse under loads imposed by overlying <br /> fill, and biological and chemical decomposition. It is estimated that much of this <br /> total settlement will occur during the operating life of the landfill and will be <br /> accounted for in periodic topographic surveys. <br /> Remaining site capacity will be evaluated periodically and any significant <br /> changes will be addressed during future operating permit revisions. <br /> Forward Landfill)TD 4-11 <br /> L:\Allied\2000.793\ReportsVtd:Sec-4.0:05/24/02 BRYAN A.STIRRAT 6 ASSOCIATES <br />