Laserfiche WebLink
To achieve adequate waste compaction, the active working face is sloped at <br /> approximately 3:1 (horizontal:vertical) or flatter. The working face is covered <br /> daily with at least 6 inches of cover soil or a permitted alternative daily cover <br /> material. The top surface and sides of the advancing lift are covered with a <br /> layer of soil at least one foot thick when wastes are not scheduled to be <br /> placed within 180 days. <br /> Forward Landfill]TD 6-7 <br /> L:\Allied\2000.193\Reports\finaljtd:Sec-6.0 6-9-03:5/22/02 <br /> Rev. 1: 7/2002: Rev. 2:4/2003; Rev 3: 6/2003 <br />