Laserfiche WebLink
Personal Protective Equipment (PPE); depending on job function, personnel may <br /> be required to utilize the following PPE and equipment: <br /> • Industrial first-aid kits located in the landfill office trailer, RRF office, and <br /> maintenance area. <br /> • Steel toed and soled safety shoes <br /> • Disposable respirators <br /> • Gloves <br /> • Hard Hats <br /> • Safety Glasses <br /> • Chemical-resistant Coveralls <br /> • Hearing Protection <br /> • Specialized equipment as necessary depending on the area they are working <br /> in. <br /> • Portable eyewash located in the locker area of the maintenance area. <br /> • Decontamination shower located in the maintenance area with a 250-gallon <br /> capacity. <br /> • Four liquid pumps. <br /> Depending on their job function, personnel at the RRF are required to wear steel <br /> toed and soled.safety shoes, gloves, safety vests, hard hats, hearing protection, and <br /> safety glasses. <br /> 3.1.10 WASTEWATER DISPOSAL <br /> There is no on site wash water generated. The tipping area is swept instead of <br /> washed down. There is no drainage leaving the RRF building. <br /> 3.2 STATION CONTROLS <br /> 3.2.1 DRAINAGE CONTROL <br /> In accordance with 14 CCR, Section 17407.3, the facility was designed with <br /> drainage control features as follows: <br /> Transfer Station <br /> The transfer/processing of materials will be done within the 12,000 square foot <br /> building. Rainwater from the roof of the building will be directed from the down <br /> spouts to the existing drain ditches and then to the sedimentation pond. <br /> Forward,Inc.Resource Recovery Facility 3-12 <br /> Transfer/Processing Report <br /> (L:\Allied\2003.0146\Report\Final TPR\Sec3.doc:10/22/03;Revision 1: 11/20/2003+4J4&f-2803) <br /> ®RYAN A.STIRRAT 6 ASSOCIATES <br />