My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:49:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_3.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
including closure certification, will be completed for each closure stage to verify <br /> proper final closure construction. <br /> Stage 1 <br /> Stage I is a 90.2-acre area as shown on Figure 1. This area includes the final fill <br /> slopes on the northern and southern portions of the landfill from the edge of the <br /> base liner system up to an elevation of 150 feet above mean sea level (AMSC). <br /> The closure volume estimates are based on waste fill up to an elevation 150 feet <br /> AMSL down to the master plan base grades. As part of this project, the area will <br /> be cleared and grubbed, as necessary, and the closure improvements constructed <br /> (e.g., final cover, permanent drainage, landfill gas systems modification etc.). It is <br /> anticipated that this area will be closed in approximately 3 years or i ,2006 <br /> depending on actual refuse inflow rates experienced over�-time. e_. , <br /> Calculations and assumptions in support of the Stage I Closure Area site life <br /> estimate are included as Attachment 1. <br /> Stage 11 <br /> Stage II is a 5.6-acre area as shown on Figure 2. This area includes the final fill <br /> slopes along the southern slopes of the northern portion of the landfill up to an <br /> elevation of 150 feet AMSL. The closure volume estimates are based on waste fill <br /> up to an elevation of 150 feet AMSL down to master plan base grades. As part of <br /> this project, the area will be cleared and grubbed, as necessary, and the closure <br /> - improvements constructed (e.g., final cover, permanent drainage, landfill gas <br /> system modification, etc. <br /> Stage 111 <br /> Stage III is a 5.9-acre area as shown on Figure 3. This area includes the final fill <br /> slopes adjacent to Stage II along the southern slopes of the northern portion of the <br /> landfill to an elevation of 150 feet AMSL. The closure volume estimates are based <br /> on waste fill up to an elevation of 150 feet AMSL down to the master plan base <br /> grades. As part of this project, the area will be cleared and grubbed, as necessary, <br /> and the closure improvements constructed (e.g., final cover, permanent drainage, <br /> landfill gas system modification, etc.). <br /> Stage IV <br /> Stage IV is a 13.7-acre area as shown on Figure 4. This area includes the final fill <br /> slopes located between Stages III and I and along the northern slopes up to an <br /> elevation of 150 feet AMSL. The closure volume estimates are based on waste fill <br /> up to an elevation of 150 feet AMSL down to the master plan base grades. As <br /> part of this project, the area will be cleared and grubbed, as necessary, and the <br /> closure improvements constructed (e.g., final cover, permanent drainage, landfill <br /> ..� 3 <br /> Forward Landfill-PCPCMPR <br /> (L•\Allied\2003.003 Western Region\FORWARD\PCPCMPR\FlnalCPR.doc) <br />
The URL can be used to link to this page
Your browser does not support the video tag.