My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> the ® INTERFACE DIRECT SHEAR <br /> up. ASTM D5321 <br /> Checked By: <br /> OProject Name: FORWARD LANDFILL Proj.No.: 809918 Date: 09/26/2000 <br /> Sample Number: INF-2A Load,psL: 6,000 Tested By: DGC <br /> SampleDescription: SANDY CLAY/GCL/SS TEXTURED HDPE,60 mil,(TEXTURED SIDE UP). <br /> F-- <br /> NORMAL <br /> LOAD I COMPACTED SOIL <br /> �r GCL <br /> TEXTURED HDPE Max.Dry Density, cf. 110.5 <br /> (TEXTURED UP) Opt.Water Content,% 15.3 <br /> Soil Initial w/c.,% 17.3 <br /> Initial Density, cf. 99.5 <br /> SHEAR DIRECTION oil Final w/c.,% 18.6 <br /> All components of the liner system were exposed+3/16"on soil. erity,inch. 0.018 <br /> DISPLACEMENTS, SHEAR, TEST SHEAR LOAD VS. DISPLACEMENTS <br /> .001"/div. sf. CONDITIONS <br /> 0 11 1.Anchor the SS textured HDPE onto <br /> 50 885 the bottom box with the textured side 6000 --- <br /> 100 <br /> 000 100 998 up and spray with water. <br /> 150 1005 2.Placed the hydrated GCL(24 hrs) <br /> 200 1014 on top of the textured HDPE. <br /> 250 1030 3. Compact the subgrade material to 5000 <br /> 300 1118 90%of max. dry density at opt. +2% <br /> 400 1464 water content onto the upper box and <br /> 500 1860 laced it on top of the GCL. 4000 <br /> 600 2128 4.Apply the full normal load. <br /> 800 2400 5. Flood the whole system with water a <br /> 1000 2588 and allow to hydrate and consolidate <br /> 1200 2708 or approx. 18-20 hrs. before shearing. O 3000 <br /> 1400 2804 6. Shear at 0.04 inches/minute. <br /> 1600 2817 7. Failure occurs in between the <br /> 1800 2779 GCL and the textured HDPE. 2000 <br /> 2000 2540 <br /> 2200 2154 <br /> 2400 1791 <br /> 2600 1528 1000 <br /> 2800 1341 <br /> 3000 1145 <br /> 3200 1012 <br /> 3400 947 0 <br /> 3600 935 0 1000 2000 3000 4000 <br /> 3800 928 DISPLACEMENTS,(.001"/div.) <br /> SYX93t8a <br />
The URL can be used to link to this page
Your browser does not support the video tag.