Laserfiche WebLink
Y <br /> Contents <br /> Section Page <br /> 1 Introduction.......................................................................................................................... 1-1 <br /> 2 WMU FU-03 Base and Final Grading. ......................................................................... .2-1 <br /> 2.1 General...................................................................................................................... .2-1 <br /> 2.2 Interface Liner....................................................................................I............................2-2 <br /> 3 WMU FU-03 Slope Stability...............................................................................................3-1 <br /> 3.1 Seismic Hazard Analysis....................................................................... .........................3-2 <br /> 3.2 Analytical Method ...........................................................................................................3-3 <br /> 3.3 Stability Analysis.............................................................................................................3-4 <br /> 3.3.1 Material Properties.............................................................................................. 3-4 <br /> 3.3.2 Results of Slope Stability Analyses...................................... .............................3-5 <br /> 4 WMU FU-03 Surface Drainage and Westerly Desilting Basin........... ...........................4-1 <br /> 5 WMU FU-03 Containment System and <br /> WMU F-West Leachate Surface Impoundment............................. ...................5-1 <br /> 5.1 Lining System........................................................................................................... 5-2 <br /> 5.2 Leachate Collection and Removal System (LCRS).................................................. 5-3 <br /> 5.3 Protective Operations Layer..................................................................................... 5-5 <br /> 5.4 WMU F-West Leachate Impoundment.................................................................... 5-5 <br /> 6 Summary...............................................................................................................................6-1 <br /> 7 References_— ....................................................................................7-1 <br /> Appendices <br /> Appendix A. Construction Drawings <br /> Appendix B. WMU FU-03 Design Calculations <br /> Appendix C. Specifications <br /> Appendix D. Construction Quality Assurance(CQA)Manual <br /> Tables <br /> 3-1 Material Properties Used for WMU FU-03 Stability Analysis Forward Landfill .................3-5 <br /> FORWARD LANDFILL WMU F-03 AND F-WEST DESIGN REPORT <br />