My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.7 DRAINAGE <br /> A. The CONTRACTOR is responsible for the diversion and control of surface water <br /> within the Work area throughout the construction period. <br /> B. Surface flows shall be controlled so as not to adversely impact adjacent areas <br /> onsite. <br /> 3.8 CLEANING DURING CONSTRUCTION <br /> A. It is required that the entire site be kept in a neat and orderly condition, and the <br /> OWNER may, at any time during construction, order a general cleanup of the site <br /> as a part of the Work under this Section. <br /> B. CONTRACTOR shall dispose of waste, trash, and debris in a safe, acceptable <br /> manner, in accordance with applicable laws and ordinances and as prescribed by <br /> authorities having jurisdiction. Non-hazardous waste material and debris may be <br /> disposed onsite with prior approval of the OWNER. Burning of trash and debris <br /> on the site will not be permitted. <br /> C. Cleanup: The CONTRACTOR will be required to clean up construction Work <br /> areas including all office facilities and dispose of waste material. Cleanup of <br /> construction Work areas will be required on a daily basis. At the close of each <br /> day's Work all small quantities of waste and debris resulting from construction <br /> activities and from office facilities shall be gathered up and disposed of in suitable <br /> receptacles. Waste and debris shall not be allowed to accumulate in such <br /> quantities as to create an unsightly appearance, or safety or fire hazard, nor shall it <br /> interfere in any way with free access to, and operation of existing facilities. <br /> D. Waste Disposal: The CONTRACTOR shall provide suitable receptacles for all <br /> construction office waste material such as wrapping paper, discarded containers, <br /> scrap lumber, scrap metals, and so on. Construction office waste shall be <br /> disposed as CONTRACTOR's property in a safe, acceptable manner, in <br /> accordance with the applicable laws and ordinances and as prescribed by <br /> authorities having jurisdiction. Non-hazardous waste material and debris may be <br /> disposed onsite with prior approval of the OWNER <br /> PART 4 MEASUREMENT AND PAYMENT <br /> (Refer to Section 01200, MEASUREMENT AND PAYMENT PROCEDURES) <br /> END OF SECTION <br /> FORWARD LANDFILL 01500 <br /> TEMPORARY FACILITIES <br /> 7 AND CONTROLS <br />
The URL can be used to link to this page
Your browser does not support the video tag.