My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. To provide satisfactory breakdown of materials to form a dense <br /> homogeneous fill free of visible voids. <br /> b. If hand-operated equipment is used, it shall be capable of achieving <br /> specified densities. <br /> C. If inadequate densities are obtained, provide larger and/or different <br /> types of additional equipment. <br /> d. Roll the finished surface of the final lift with a smooth steel drum <br /> roller or rubber-tired roller to eliminate tire or roller marks and <br /> provide a smooth, dense surface. <br /> D. Moisture Control Equipment:Equipment for applying water shall be of a type and <br /> quality adequate for the Work, shall not leak, and shall be equipped with a <br /> distributor bar or other approved device to assure uniform application. Equipment <br /> for mixing and drying out material shall consist of blades, discs, or other approved <br /> equipment. <br /> 2.10 EXCAVATION <br /> A. Excavation is unclassified. Complete all excavation, regardless of the type, <br /> nature, or condition of the materials encountered. The EARTHWORK <br /> CONTRACTOR shall be responsible for making own estimate of the kind and <br /> extent of the various materials to be excavated in order to accomplish the Work. <br /> 2.11 SLURRY CEMENT MIXTURE <br /> A. Slurry cement backfill cement mixture shall conform to Standard Specifications <br /> Section 19-3.062 Slurry Cement Backfill. <br /> 2.12 CONCRETE <br /> A. Miscellaneous concrete for anchorage of the pipe support columns shall conform <br /> to the applicable provisions in Caltrans Standard Specification Section 51 Minor <br /> Concrete. <br /> 2.13 PIPE SUPPORT AND CLAMP <br /> A. Pipe support and clamp shall conform to the provisions in Caltrans Standard <br /> Specification Section 75, Miscellaneous Metal. <br /> 2.14 POROUS SUCTION CUP LYSIMETERS AND PROTECTIVE VAULT BOX <br /> A. Porous suction cup lysimeters shall conform with the requirements of ASTM <br /> D4696, Standard Guide for Pore-Liquid Sampling from the Vadose Zone. <br /> B. Protective vault box shall be of sufficient durability to protect lysimeter leads <br /> from adverse weather and traffic loads. <br /> FORWARD LANDFILL 02300 <br /> 8 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.