My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. The EARTHWORK CONTRACTOR shall notify the OWNER at least 3 <br /> working days in advance of when the subgrade is completed and ready for <br /> as-built surveys. The OWNER will survey the top of the base and slope <br /> subgrade in accordance with Section 01410, SURVEYS. The survey shall <br /> provide coordinates and elevations of the subgrade surface at a minimum of <br /> 75-foot centers and delineating prominent features. The results of the <br /> survey will be provided to the QA/QC CONSULTANT within 2 days of the <br /> survey for approval prior to placing overlying materials. The QA/QC <br /> CONSULTANT shall have 2 working days to review survey results and <br /> may independently verify survey results. The time taken by the QA/QC <br /> CONSULTANT in checking and verifying the survey results will be <br /> considered included in the total calendar days allotted the EARTHWORK <br /> CONTRACTOR before liquidated damages are assessed. <br /> B. After completion of clay liner and subgrade fill, proof-roll the surface of the entire <br /> lined area with a loaded dump truck or similar heavy-wheeled equipment to detect <br /> soft or loose zones. Notify the QA/QC CONSULTANT prior to commencement <br /> of proof-rolling. If soft or loose zones are found, excavate the soft or loose <br /> material to a depth accepted by the QA/QC CONSULTANT, then fill with Clay <br /> Liner or General Earthfill, as appropriate. The Clay Liner or General Earthfill <br /> shall be compacted as specified for such fill. <br /> 3.9 CONSTRUCTION OF CLAY LINER <br /> A. General: <br /> 1. Clay Liner Material shall be processed to meet the requirements of Article <br /> 2.4 of this Specification. Exhibit A has been included to provide <br /> information on successful processing and placement procedures used for the <br /> construction of WMU D-01 at the Forward Landfill. The EARTHWORK <br /> CONTRACTOR shall have the option to determine construction procedures <br /> to be used, subject to the approval and acceptance testing by the QA/QC <br /> CONSULTANT. <br /> 2. The EARTHWORK CONTRACTOR shall process the Clay Liner Material <br /> suitable for the purpose intended. After processing, the Clay Liner Material <br /> shall be free from dry clods, roots, organic matter, frozen material, debris, <br /> rocks or stones larger than 1 inch, and other deleterious material. Clay <br /> Liner Material shall be thoroughly blended and compacted to provide a <br /> homogeneous material relatively uniform in gradation and moisture content. <br /> FORWARD LANDFILL 02300 <br /> 13 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.