My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The EARTHWORK CONTRACTOR shall repair or replace any materials <br /> damaged during placement of the slurry cement mixture, at the EARTHWORK <br /> CONTRACTOR's sole expense. <br /> 3.19 PIPE SUPPORT AND PIPE CLAMP <br /> A. Install at the locations shown on the Construction Drawings. <br /> 3.20 POROUS SUCTION CUP LYSIMETERS AND PROTECTIVE VAULT BOX <br /> A. Install in accordance with Manufacturer's Instructions. <br /> B. The CONTRATOR shall test the lysimeters to check that they are functioning <br /> properly before the lysimeters are covered with subsequent courses of material. <br /> The test results shall be provided to the QA/QC Consultant. <br /> 3.21 BOLLARDS <br /> A. Install in accordance with Manufacturer's Instructions. <br /> B. Bollards shall be located such that they protect the top of the leachate riser pipes. <br /> 3.22 SITE GRADING <br /> A. Perform all earthwork to the lines and grades as shown on the Construction <br /> Drawings and/or established by the DESIGN ENGINEER. Shape, trim, and finish <br /> slopes of channels to conform with the lines, grades, and cross sections shown. <br /> Make slopes free of all exposed roots and stones exceeding 3-inch diameter that <br /> are loose and liable to fall. Round tops of banks to circular curves, in general, not <br /> less than a 6-foot radius. Rounded surfaces shall be neatly and smoothly trimmed. <br /> Neatly blend all new grading into surrounding, existing terrain, and maintain <br /> current drainage patterns or modify drainage as shown on the Construction <br /> Drawings. Overexcavating and backfilling to the proper grade will not be <br /> acceptable. Finished site grading will be reviewed by the QA/QC <br /> CONSULTANT. <br /> 3.23 TOLERANCES <br /> A. Construct material limits within tolerance specified in Section 01410, SURVEYS. <br /> 3.24 TOPOGRAPHIC SURVEYS <br /> A. Refer to Section 01410, SURVEYS, for requirements regarding preconstruction <br /> surveys. <br /> FORWARD LANDFILL 02300 <br /> 25 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.