My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.6 QUALITY ASSURANCE <br /> A. The QA/QC CONSULTANT shall monitor the quality of the geocomposite in <br /> accordance with the CQA Manual. <br /> 1.7 DELIVERY, STORAGE,AND HANDLING <br /> A. General: Conform to the manufacturer's requirements. <br /> B. Delivery: <br /> 1. Deliver materials to the site only after the QA/QC CONSULTANT accepts <br /> required submittals. <br /> 2. Separate damaged rolls from undamaged rolls and store at locations <br /> designated by the OWNER until proper disposition of material is determined <br /> by the QA/QC CONSULTANT and the OWNER. <br /> 3. The GEOSYNTHETICS CONTRACTOR shall be responsible for damage to <br /> the Geocomposite during delivery, even if the rolls are unloaded by the <br /> EARTHWORK CONTRACTOR. The QA/QC CONSULTANT will <br /> determine damage. <br /> 4. Deliver in rolls, do not fold. <br /> C. Storage on Site: <br /> Ask <br /> 1. Store geocomposite rolls in the space allocated by the OWNER. <br /> qW 2. Store geocomposite rolls to protect from puncture, dirt, grease, water, <br /> moisture, mud, mechanical abrasions, excessive heat or other damage. <br /> 3. Store geocomposite rolls on prepared surface (not on wooden pallets). <br /> 4. Stack geocomposite rolls no more than three rolls high. <br /> D. Handling on Site: <br /> 1. Use appropriate handling equipment to load,move,and deploy geocomposite <br /> rolls. Appropriate handling equipment includes cloth chokers and spreader <br /> bars for loading,and spreader and roll bars for deployment. Dragging panels <br /> on ground surface will not be permitted. <br /> 2. Do not fold geocomposite; folded material will be rejected. <br /> 3. The GEOSYNTHETICS CONTRACTOR is responsible for off-loading, <br /> storage, and transporting material from storage area to installation site. <br /> PART 2 PRODUCTS <br /> 2.1 GENERAL <br /> A. Geocomposite with a nonwoven geotextile bonded to one side of the geonet shall be <br /> placed on the slopes. <br /> FORWARD LANDFILL 02774 <br /> GEOCOMPOSITE <br /> 3 DRAINAGE NET <br />
The URL can be used to link to this page
Your browser does not support the video tag.