Laserfiche WebLink
q' Pre-processed ADC materials tMased will be l8inches or less in dimension. <br />d <br />r. The pre-processed treated auto shredder waste must be deployed in a manner that does not allow the mixing of the cover and the <br />waste. The pre-processed treated auto shredder waste cannot be used during rainy weather or anticipated rainy weather. <br />s. The ash and cement kiln dust must be applied in such a manner as not to create voids or dust. <br />t. For shredded green material ADC, the following conditions must be met: <br />A track dozer is to be used to spread and compact the green material. <br />• The processed green material shall not contain greater than five (5) percent contamination (plastic or paper bags, mix solid <br />waste, or construction and demolition waste). <br />• The processed green material must have a minimum thickness of 6 inches and an average compacted thickness of 12 inches <br />u. The use of the ADC shall conform to all conditions of the ADC demonstration project as approved by the LEA and maybe <br />suspended or modified at any time for sufficient cause. <br />v. If the site operator plans to use a new ADC, allowed by and described in, Title 27, CCR, Section 20690, the operator must submit <br />any proposed changes to the ADC program in the form of an RFI amendment 150 days prior to the anticipated change. <br />w. The LEA reserves the right to require additional measures to adequately control nuisances resulting from landfilling activies as <br />needed <br />x. The operator shall at all times provide adequate staffing to deal effectively and promptly with operations at the site as needed <br />Y. The operator shall provide at all rimes adequate numbers and types of operable equipment for compaction and placement of the <br />waste and cover at the facility. <br />z. An adequate water supply for dust and fire suppression shall be available at all times during the operation of this facility. The <br />water supply must be acceptable to the local fire jurisdiction and the LEA. <br />aa. Additional information concerning the design and operation of the facility shall be furnished upon request and within the time <br />frame specified by the LEA. The operator must supply the LEA with any information the LEA deems necessary to conduct an <br />inspection or to review and rewrite a Solid Waste Facility Permit. <br />bb. The LEA must receive notification from the facility operator 48 hours prior to operating on a Sunday. <br />Page 5 of 5 <br />