ZJUCTOR <br /> ENGINEERING,INC <br /> DAILY CONSTRUCTION FIELD REPOR <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 74 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan Forward,Inc. December 1,2003 Monda <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San seta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Awe Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled, light brown silty Clay Cool, overcast and Ken Davila <br /> bree (raining) <br /> Equipment on site: <br /> None o atin <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the GSE foreman to discuss the work schedule for today. They began <br /> vacuum box testing the tie-in seams along the south and west slopes. Twelve-ounce(12oz)geotextile began <br /> to be removed over the northeastern quadrant of the FU-03 cell floor in anticipation of tomorrow's leak <br /> testing. The off and on rains kept extrusion welding from being performed. The GSE foreman stated that <br /> because of the rain,they would not continue with the cross seam patch welding and vacuum box testing <br /> until tomorrow. <br /> Sukut Construction was not on site today. <br /> Three(3)flat bed trucks arrived on site in the early afternoon to remove the unused rolls of GCL off site. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-, <br />