My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"or IVNIV <br /> vC'TOR <br /> ENGINEERING INC. <br /> DA/LY CONSTRUCTION UC /ON F/ELD REPORT <br /> Project Name: Project No. Lily Field Report Sequence Number: <br /> Forward Landfill 021605.03 76 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward,Inc. December 3,2003 1 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Comm: <br /> Tim Sues Are Khounmouang LocWin Caffe <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native,stockpiled,light brown silty Clay Cool,overcast and Ken Davila <br /> brae <br /> Equipment on site: <br /> 1-16G blade, 1-ski loader, 1-backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with Forward personnel to observe and document the leak location testing <br /> progress. Leak Location Services,Inc. (LLSI)arrived on site in the early to mid morning and completed the <br /> northern third of the FU-03 cell. Two(2) leaks total were detected on different cross seam patches that had <br /> purposely not been vacuum tested. Repairs were made at these locations and were then retested. The LLSI <br /> foreman stated that testing documentation would be given to Forward personnel at a later date and that <br /> copies would then be given to Vector. <br /> After the testing was completed,GSE began twelve-ounce(12oz)geotextile deployment in the <br /> northeastern quadrant of the cell floor. The GSE foreman stated that geotextile deployment would continue <br /> for the remainder of the day. <br /> Sukut Construction welded cell pipe and pipe for the leachate pond. The blade backfilled the west anchor <br /> trench of the 5:1 slope and along the west slope/berm between the sedimentation pond and the cell. <br /> The weekly meeting was held in the afternoon to discuss project progress and scheduling. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-, <br />
The URL can be used to link to this page
Your browser does not support the video tag.