Laserfiche WebLink
TZECTOR <br /> ENGINEERING INC. <br /> DAILY <br /> CONSTRUCTION FIELD REPQRT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 84 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward,Inc. December 17,2003 Wednesda <br /> General Contractor: Liner Contractor: Project Engineer; <br /> Sukut Construction GSE San seta Lewis <br /> General Foreman: Liner superintendent: tom: <br /> Tim Sues Are Khounmouan9 Montie Christie Vector <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native,stockpiled, light brown silty Clay Cool,cloudy and breezyKen Davila <br /> Equipment on site: <br /> 1-D6 LGP dozer -backhoe, 1-627 scra er 1-D4 dozer 8-Transfer trucks, 1-966 loader mowed from Forward Inc. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> On site today for documentation and observations at the location listed above. Sukut began hauling <br /> granular drainage material using the transfer trucks. They used the D4 and D6 to spread out the granular <br /> drainage material from east to west throughout the day. One concrete truck arrived on site with nine(9) <br /> yards of cement slurry and poured the collar at the sedimentation pond spillway,the southeast FU-03 cell <br /> anchor trench and a portion of the northeast anchor trench at the 5:1 slope. The scraper hauled stockpiled <br /> clay to the top of the north 5:1 slope to place as anchoring material. <br /> Montie C. was briefly on site to collect data sheets pertinent to the final report and to transport one sample <br /> of the granular drainage material to the Vector laboratory. This sample will be tested for constant head <br /> permeability. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-, <br />