17EC"TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPOR <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 93 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch StefaniForward, Inc. January 15, 2004 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Matt Morrow Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Imported—3/8" Granular Drainage Material Cool,overcast and bree Ken Davila <br /> Equipment on site: <br /> 1-D6 dozer, 1-966 loader, 1-D8 dozer, 1-325 excavator, 1-D250 haul truck 1-LGP d6 dozer, 10-belly duME trucks <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the Guinn foreman to discuss today's operations. They began placing <br /> granular drainage material on the southeast comer and continued throughout the day. Prior to placing the <br /> geotextile,the thickness of the drainage rock was physically checked and placed using a GPS system <br /> attached to the low ground pressure dozer. Operations layer was placed in the south central floor of the FU- <br /> 03 cell. The operations layer material was taken from the on site stockpile. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-� <br />