"'TOR <br /> ENGINEERINC,INC. <br /> 0 <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 95 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. January 19,2004 Monda <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Jay Wellen Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Imported—3/8"Granular Drainage Material Cool,overcast and breezy Ken Davila <br /> Equipment on site: <br /> 1-D6 dozer, 1-966 loader, 1-D8 dozer, 1-330 excavator,2-D250 haul trucks, 1-LGP D6 dozer, 10-belly dump trucks, 1-D350 haul <br /> truck, 1-TH103 extendalift loader,8-transfer trucks <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn construction continued placing granular drainage material on the southwest corner and western <br /> edge of the FU-03 cell floor, working south to north. Prior to placing the eight-ounce(8 oz) geotextile,the <br /> thickness of the drainage rock was checked with the measuring rod and also placed using a GPS system <br /> attached to the dozers. Operations layer was placed in the southwest comer of the cell. The operations layer <br /> material was taken from the on site stockpile. A new Guinn superintendent and foreman arrived on site <br /> today,Jay Wellen and Curtis Donahue, respectively. After meeting with them,they stated that they would <br /> remove the cell sump pipe, discard the saturated geotextile from the sump, clean the rocks out and begin <br /> placing new geotextile. These tasks were completed by shift's end. <br /> I informed the liner installer's superintendent that his presence would be required at the middle or end of <br /> this week and that I would try to give him 24 hours advanced notice. <br /> One sieve analysis was completed and another sample obtained of the granular drainage material. The <br /> sieve was within specifications. <br /> Prepared By: Reviewed By: --70 <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-, <br />