Laserfiche WebLink
v r, CTOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 21 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Forward,Inc. Se t 26,2003 Friday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE <br /> General Foreman: Liner Superintendent: Other: <br /> Jim Hasal <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, light brown silty CLAY Warm,clear and Ken Davila <br /> wind <br /> Equipment on site: <br /> 1-D6 dozer 1-water truc 1-D8 dozer 1-633 scra er, I- 16G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Arrived on site for testing and observations at the location listed above. Sukut Construction continued cutting <br /> the slopes in the FU-03 refuse cell. The blade continued cutting the drainage ditches on the floor of the <br /> refuse cell while the scraper hauled the cut material to the stockpile. The D8 dozer began clearing and <br /> grubbing the access road area in preparation for fill placement. <br /> sieve analysis was dropped off by Conti Materials Service to review for the 3/8 inch minus granular <br /> ainage material that will be delivered at a later date. After reviewing the test results performed by others, it <br /> appears that the material will be acceptable pending further on site and off site laboratory testing. One <br /> Atterberg limits test on sample CL-5 was started and will moisture condition over the weekend. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-,7 <br />