My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v r, CTOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 21 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Forward,Inc. Se t 26,2003 Friday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE <br /> General Foreman: Liner Superintendent: Other: <br /> Jim Hasal <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, light brown silty CLAY Warm,clear and Ken Davila <br /> wind <br /> Equipment on site: <br /> 1-D6 dozer 1-water truc 1-D8 dozer 1-633 scra er, I- 16G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Arrived on site for testing and observations at the location listed above. Sukut Construction continued cutting <br /> the slopes in the FU-03 refuse cell. The blade continued cutting the drainage ditches on the floor of the <br /> refuse cell while the scraper hauled the cut material to the stockpile. The D8 dozer began clearing and <br /> grubbing the access road area in preparation for fill placement. <br /> sieve analysis was dropped off by Conti Materials Service to review for the 3/8 inch minus granular <br /> ainage material that will be delivered at a later date. After reviewing the test results performed by others, it <br /> appears that the material will be acceptable pending further on site and off site laboratory testing. One <br /> Atterberg limits test on sample CL-5 was started and will moisture condition over the weekend. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-,7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.