Laserfiche WebLink
170R <br /> -ou <br /> ENGINEERING 11VC. <br /> 0 <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 23 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Forward,Inc. Sept 30,2003 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE <br /> General Foreman: Liner Superintendent: Other: <br /> Jim Hasal <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, light brown silty CLAYWarm, clear and Ken Davila <br /> wind <br /> Equipment on site: 7 <br /> 1-D6 dozer, 1-water truc 1-D8 dozer,2-633 scra ers, 1- 16G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Arrived on site for testing and observations at the location listed above. Sukut Construction began placing fill <br /> along the access road to the FU-03 refuse cell from the scale house west. The blade continued cutting the <br /> floor of the refuse cell and the D6 cut the west slope of the cell with the scraper hauling the cut material to <br /> the haul road fill area. The D8 dozer applied compactive effort along with the scrapers in the fill area. <br /> Seven(7)nuclear moisture density tests were performed at random locations and elevations on the native fill.® <br /> All tests passed specification in density and in moisture content. One(1)sample was obtained for moisture <br /> content comparison with the nuclear gauge on field density test number sixty-nine(69). The sample was <br /> placed into the oven and will be calculated tomorrow. The on site foreman was verbally informed of the test <br /> results. Other on site laboratory testing included an Atterberg limits test on sample CL-5,which was <br /> performed in the late morning. The sample was placed into the oven for overnight moisture content drying. <br /> Lochlin Caffey(Allied)called in the mid afternoon to schedule a mid morning on site meeting and asked if I <br /> would inform Sukut to attend. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-,) <br />