My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2005_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:49:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2005_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.7 SITE LIFE PROJECTION <br /> 4.7.1 SITE LIFE CALCULATIONS <br /> In order to calculate the site life for the Forward Landfill, the following criteria <br /> was utilized. <br /> • Remaining Site Capacity (with liner, daily, <br /> intermediate and final cover) 32.3 mcy <br /> • Refuse to Cover Ratio 4:1 <br /> • In-Place Density 1,740 lbs/cy <br /> Based on the above criteria and utilizing a inflow rate of 32,506 tons/week with <br /> a 2 percent annual growth rate and a maximum weekly permitted refuse inflow <br /> rate of 46,080 tons/week, the Forward Landfill will have a projected site life of <br /> 13 years. Based on these calculations (see Table 8) operations at the Forward <br /> Landfill could extend to March 2017. <br /> 4.7.2 FACTORS AFFECTING SITE CAPACITY <br /> Many factors can affect the ultimate site capacity of a given landfill including <br /> variations in waste type, compaction rates, the use of alternative daily covers and <br /> the annual tonnage delivered to the landfill. The actual daily tonnage at the <br /> Forward Landfill depends greatly on the economy. Since a good majority of the <br /> waste accepted at the Forward Landfill will be construction/demolition type <br /> wastes, the inflow will be dependent on how much of that type of work is <br /> occurring in the area. The tonnage will also vary as the contracts with clients <br /> fluctuate and specialty markets change. Therefore, there may be times when the <br /> Forward Landfill will be accepting the maximum permitted tonnage of 46,080 <br /> tons/week and others where it may fall way below. Table 8 is presented to <br /> provide a rough estimation of the inflow to the Forward Landfill for permitting <br /> purposes. <br /> In addition, long-term landfill settlement can also have a great impact on site <br /> capacity and may average 25 percent of the total refuse thickness. The total <br /> effects of settlement will depend on various factors or processes such as the <br /> types of refuse placed and their corresponding moisture content, the refuse <br /> Forward Landfll JTD 4-12 <br /> J:\Allied\Forward\JTD Amendment\Final JTD Amendment\)TD Sec 4 080105.doc:05/24/02 <br /> BRYAN A STIRRAT 6 ASSOCIATES <br /> Amendment No.1: 8/1/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.