Laserfiche WebLink
placement density, consolidation of the refuse under loads imposed by overlying <br /> fill, and biological and chemical decomposition. It is estimated that much of this <br /> total settlement will occur during the operating life of the landfill and will be <br /> accounted for in periodic topographic surveys. <br /> Remaining site capacity will be evaluated periodically and any significant <br /> changes will be addressed during future operating permit revisions. <br /> Forward Landfill JTD 4-13 <br /> ):\Allied\Forward\JTD Amendment\Final)TD Amendment\JTD Sec 4 080105.doc:05/24/02 <br /> Amendment No. 1: 8/1/2005 ®RYAN A.STIRRAT&ASSOCIATES <br />