Laserfiche WebLink
California and responsible for overseeing completion of quality assurance earthwork observation, <br /> inspection and soil testing. <br /> "Independent Testing Laboratory" - The firm responsible for conducting tests on soils samples. <br /> "Landfill Engineer" - The firm responsible for design and preparation of the Project Drawings <br /> and Specifications. All completed work is subject to approval by the Landfill Engineer. <br /> "Owner" -The owner of the site, in this case, Allied Waste Industries, Inc. <br /> "Project Documents" -All Contractor submittals, Construction Drawings, Record Drawings, <br /> "As-Built" Plans, Construction Specifications, CQA Plan, Health and Safety Plan and Project <br /> Schedule. <br /> "Project Manager" - Allied Waste's designated representative responsible for the project. <br /> "Project Drawings, Plans and Specifications" -All project related Drawings and Specifications <br /> including design modifications and Record Drawings. <br /> CQA Officer" - The representative for the Geotechnical CQA Consultant who will be <br /> responsible for overall review, observation, sampling and testing activities for construction. <br /> " "CQA Monitors" - The individuals working under the direction of the CQA Officer. Such <br /> personnel include "Technicians", Field Engineers and Field Geologists" representing the <br /> Engineer and Geotechnical CQA Consultant. CQA Monitors responsible for the earthwork, shall <br /> be experienced in landfill construction monitoring, soil construction and compaction testing <br /> during grading operations. <br /> "Work" - All tools, equipment, supervision, labor, and materials or supplies necessary to <br /> complete the project as specified herein and as shown on the Project Drawings. <br /> 3.0 CQA ORGANIZATION <br /> The CQA Team will consist of design and field personnel with specific experience in the <br /> inspection and CQA monitoring of earthwork activities related to landfill alternative final cover <br /> construction. Figure 1 shows the CQA Project Organization Chart for the project with principal <br /> functions of the CQA team presented below: <br /> -3- <br /> CLA/2005-0082/FOR WARD/CQAPLAN.doc/7/15/2005 <br /> Geologic Associates <br />