My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2005_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:49:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2005_2.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California and responsible for overseeing completion of quality assurance earthwork observation, <br /> inspection and soil testing. <br /> "Independent Testing Laboratory" - The firm responsible for conducting tests on soils samples. <br /> "Landfill Engineer" - The firm responsible for design and preparation of the Project Drawings <br /> and Specifications. All completed work is subject to approval by the Landfill Engineer. <br /> "Owner" -The owner of the site, in this case, Allied Waste Industries, Inc. <br /> "Project Documents" -All Contractor submittals, Construction Drawings, Record Drawings, <br /> "As-Built" Plans, Construction Specifications, CQA Plan, Health and Safety Plan and Project <br /> Schedule. <br /> "Project Manager" - Allied Waste's designated representative responsible for the project. <br /> "Project Drawings, Plans and Specifications" -All project related Drawings and Specifications <br /> including design modifications and Record Drawings. <br /> CQA Officer" - The representative for the Geotechnical CQA Consultant who will be <br /> responsible for overall review, observation, sampling and testing activities for construction. <br /> " "CQA Monitors" - The individuals working under the direction of the CQA Officer. Such <br /> personnel include "Technicians", Field Engineers and Field Geologists" representing the <br /> Engineer and Geotechnical CQA Consultant. CQA Monitors responsible for the earthwork, shall <br /> be experienced in landfill construction monitoring, soil construction and compaction testing <br /> during grading operations. <br /> "Work" - All tools, equipment, supervision, labor, and materials or supplies necessary to <br /> complete the project as specified herein and as shown on the Project Drawings. <br /> 3.0 CQA ORGANIZATION <br /> The CQA Team will consist of design and field personnel with specific experience in the <br /> inspection and CQA monitoring of earthwork activities related to landfill alternative final cover <br /> construction. Figure 1 shows the CQA Project Organization Chart for the project with principal <br /> functions of the CQA team presented below: <br /> -3- <br /> CLA/2005-0082/FOR WARD/CQAPLAN.doc/7/15/2005 <br /> Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.