My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2005_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:49:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2005_2.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.0 DOCUMENTATION <br /> To provide evidence of satisfactory work performance, all stages of alternative final cover <br /> construction shall be documented. The information shall be recorded on a standardized form or <br /> in a bound field logbook. <br /> 7.1 DAILY RECORD KEEPING <br /> The purpose of daily record keeping is to record construction activities, including results of <br /> continuous visual observations; laboratory/field test data; sampling; review of test results; <br /> repairs; problems; solutions and general field activity. The CQA Monitor(s) shall keep a Daily <br /> Field Inspection Report of project activities. At a minimum, this report shall include the <br /> following: <br /> • Date and project identification. <br /> • Field activity and work locations. <br /> • Summaries of field communications. <br /> • Summary of equipment and personnel used. <br /> Work activity monitored, general location on-site and any related tests taken. <br /> Record of material sampling and testing activities. <br /> Any variance from specified methods and standards. <br /> e Estimated quantities of material placed and compacted. <br /> AML 0 Unusual events. <br /> 1P0 Actions regarding acceptance/rejection of work. <br /> O Weather conditions. <br /> O Signature of person preparing the report. <br /> The daily field inspection report shall be reviewed by the QA Manager and shall be submitted to <br /> the Construction Manager. One complete set of both daily reports shall be kept on site by the <br /> CQA personnel at all times. The contractor will be notified of the "pass/fail" nature of the CQA <br /> results but will be provided with numerical data only at the discretion of the Construction <br /> Manager. Release of the QA data to the Contractor would be for convenience only and would, in <br /> no way, relieve the Contractor from sole responsibility for fulfilling the project requirements. <br /> 7.2 PHOTO DOCUMENTATION <br /> The Construction Manager shall prepare a photographic record as part of the construction control <br /> activities. Photographs shall be in color and shall include photographs of construction activities, <br /> problem areas, corrective actions, and final constructed features. Photographs shall be identified <br /> with the site designation, the date taken, the location, and a description of the activity covered by <br /> the photograph. <br /> 7.3 AS-BUILT DOCUMENTATION <br /> As the work is completed, final Record Drawings and a report shall be prepared under the <br /> direction of the Engineer and Construction Manager utilizing the record prepared during <br /> -15- <br /> CLA/2005-0082/FOR WARD/CQAPLAN.dod7/15/2005 <br /> Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.