My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2005_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2022 3:00:48 PM
Creation date
7/3/2020 10:50:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_4 N&O 03-01+
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2005_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
812
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q. Pre-processed ADC materials tc ased will be l8inches or less in dimension. <br /> r. The pre-processed treated auto shredder waste must be deployed in a manner that does not allow the mixing of the cover and the <br /> waste. The pre-processed treated auto shredder waste cannot be used during rainy weather or anticipated rainy weather. <br /> The ash and cement kiln dust must be applied in such a manner as not to create voids or dust. <br /> t. For shredded green material ADC,the following conditions must be met: <br /> • A track dozer is to be used to spread and compact the green material. <br /> • The processed green material shall not contain greater than five(5)percent contamination(plastic or paper bags,mix solid <br /> waste,or construction and demolition waste). <br /> • The processed green material must have a minimum thickness of 6 inches and an average compacted thickness of 12 inches <br /> u. The use of the ADC shall conform to all conditions of the ADC demonstration project as approved by the LEA and maybe <br /> suspended or modified at any time for sufficient cause. <br /> v. If the site operator plans to use a new ADC,allowed by and described in,Title 27,CCR, Section 20690,the operator must submit <br /> any proposed changes to the ADC program in the form of an RFI amendment 150 days prior to the anticipated change. <br /> w. The LEA reserves the right to require additional measures to adequately control nuisances resulting from landfilling activies as <br /> needed <br /> x. The operator shall at all times provide adequate staffing to deal effectively and promptly with operations at the site as needed <br /> y. The operator shall provide at all times adequate numbers and types of operable equipment for compaction and placement of the0 <br /> waste and cover at the facility. <br /> z. An adequate water supply for dust and fire suppression shall be available at all times during the operation of this facility.The <br /> water supply must be acceptable to the local fire jurisdiction and the LEA. <br /> aa. Additional information concerning the design and operation of the facility shall be furnished upon request and within the time <br /> frame specified by the LEA.The operator must supply the LEA with any information the LEA deems necessary to conduct an <br /> inspection or to review and rewrite a Solid Waste Facility Permit. <br /> bb. The LEA must receive notification from the facility operator 48 hours prior to operating on a Sunday. <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.