Laserfiche WebLink
LXXxXxxxxxxxXXxxxx,xxXXxXxxxxXXxxxxXx <br />x 37.5 x 37.4 t_ <br />------ ----- x 37.5 <br />x38T- x_ 38.8 x 39.3 x 39.E <br />x 38.3 <br />34.8 x <br />APHI <br />GRC S 7 -LE` SGP -1 -� x 34.7 <br />50 25 50 1fl0 /'^ <br />wow \ /X/27 \ <br />( IN FEET) -� . x 34.0 / / x 33.9 \ x 35.1 <br />/ \ x 34.9 <br />x 33.2 ` zz \ <br />\ x 33.6 / x 33.6 <br />\x 33.4\ \ // <br />x 33.2 z <br />Z \ \ <br />04 (n <br />z <br />TFqk W- -. '� �� Q w <br />z0 J X Q] ... �- - - - ------ ' ... z FQ- O O > -H st J <br />O W C9 i- ONS )p Q O <br />'_ Oo > II qt X00 O�� O� <br />_--------- • • • moi c°'�-�-------------r��oo -- �rn�`rn au��------- <br />z <br />rl d1�. c ¢ <br />---- ---- <br />-- 3 --- r x 38. `- x 39.1 t'-`. N x 38.9 -� F- "'+--� x 39.1 <br />x 37.2�ju�`�----- ----- i?p ` --- ---i+icN- r-- ---fi- <br />ag_� O� M�� x 37.4 � II x 7.8 1� I - - -� (*D <br />s} - CSW^ d --x 38.3 -------- �pl- <br />3�rn� ad II >_ ¢ �� �� �d- <br />_ <br />1 PROTECT EXISTING GAS SYSTEM IN-PLACE <br />2 SURVEY LOCATION PRIOR TO FINAL COVER PLACEMENT <br />3 SALVAGE EXISTING WELL MANIFOLD/WELLHEAD ASSEMBLY <br />4 SALVAGE EXISTING 18" PVC HDPE HEADER, 2" HDPE AIR UNE <br />AND CONDENSATE LINES, PPE SUPPORTS, AND FLEX HOSES <br />O INSTAL_ TEMPORARY 4" PVC CAP ON HDPE WELL LATERAL <br />(APPROXIMATELY 2' BELOW GRADE) <br />© INSTALLTEMPORARY 18' PVC CAP ON BELOW GRADE 18' <br />PVCPE HEADER (APPROXIMATELY 2' BELOW GRADE FOR HDPE) <br />Jo.zw IIt9?� t ozw c�? =zw - z CDZz -�� -Tryozw Oz - -- TT T--�T- 7 INSTAL. TEMPORARY 2" CAP ON AIR LINE <br />x 3 _ _ '1 _ �8 INSTALL TEMPORARY 2' CAP ON CONDENSATE UNE <br />x 3 .9 <br />Em- <br />lffj"�g,I <br />IAm■�1'` �• <br />x 91.3 1111111 <br />Illllll <br />1!11111 <br />Illllll <br />1111111 <br />1111111 <br />1111111 <br />IIICII89.3 <br />!111111 <br />Illllll <br />�111f1�� <br />��� VIII ��-,• <br />11111 x 87.1 <br />IIII <br />1111 <br />IIII <br />1111 <br />1111 <br />IIII <br />1111 <br />1111 <br />1j11 x <br />11 I I x 85.5 85.4 <br />1111 <br />1111 <br />1111 <br />1111 <br />I1It <br />ce <br />N0. <br />MCI <br />_x 39.6_ x 39.9 <br />_ _ x 92.5 ------ 111 - x 91.� ------ <br />T I M I JOIN EXISTING LATERAL <br />AT TOP OF SLOPE jlllll11111 <br />I 1 <br />x 90.4 x 90.7 j111111111 <br />11111{1 11111111 <br />_ 1111111 i 1111111 <br />1 �j���j � Iilllll <br />11{1j1 � � � Illllll <br />l i l i Illllll <br />x 88.7 l l l l l l �� 111111 j111111 <br />111111 � 1111111 <br />111111 1111111 <br />1111j1 1111141 <br />111111 Illllll <br />1;111; Illllll <br />I ill mull11111,, x 87.7 l- <br />x 87.5 / 1111 x 87.9 11 11111111 c,87.3 <br />111111 ' - <br />j <br />/ I11j 111111 <br />// 1�1j 111111 <br />/ I{Il 111111 <br />I 111111 <br />/ II��111{1 x 85.2 <br />I VIII <br />1111 � � 11111 <br />IIII �� Hili <br />IIII � � 11111 <br />1111 1{111 <br />1 <br />Y ae x 84.5 11 n 111 - - x 83.9 <br />REVISION DESCRIPTION BY: <br />® z 40.8 _ _ <40.5 �9 INSTALL SALVAGED WELL MANIFOLD PER 5 OR 6 <br />�� _ <br />- - 10 INSTALL 2" SCH 80 PVC PIPE & FITTINGS (LATERAL EXTENSION) <br />:.2� <br />50 MIN 11 INSTALL TEMPORARY WELL LATERAL EXTENSION PER 1 OR 3 <br />1 <br />12 SALVAGE EXISTING ABOVE GRADE GAS HEADER PIPING <br />13 CUT & CAP EXISTING COVANTA VERTICAL WELL CASING 2' BELOW <br />60 GRADE AND SALVAGE WELLHEAD ASSEMBLY <br />14 EXTEND WELL CASING & INSTALL WELLHEAD AFTER FINAL COVER PLACEMENT <br />15 INSTALL AND CONNECT TEMPORARY BELOW GRADE 8" HDPE JUMPER TO <br />EXISTING 18" HDPE HEADER <br />70 16 INSTALL TEMPORARY 2' HDPE AIR LINE JUMPER TO EXISTING AIR LINE <br />17 INSTALL TEMPORARY 2" HDPE CONDENSATE LINE JUMPER TO EXISTING <br />2' CONDENSATE LINE <br />�8 18 INSTALL SALVAGED 18" PVC HEADER, 2" HDPE AIR UNE, q <br />AND 2" HDPE CONDENSATE LINES ON PIPE SUPPORTS PER 4 <br /><blo �k 19 INSTALL SALVAGED WELLHEAD PER 1 OR � 1 <br />90 0 INSTALL/EXTEND 4" HDPE WELL LATERAL PIPING TO HEADER OR MANIFOLD <br />21 ABANDON OR REMOVE TEMPORARY GAS, AIR, & CONDENSATE UNE JUMPERS <br />_ <br />--__o 22 JOIN EXSTING 18" HDPE OR PVC HEADER, 2 HDPE AIR & CONDENSATE LINES <br />- - - - - - <br />- - - r 3 REINSTALL COVANTA GAS SYSTEM ON GRADE <br />® INSTALL SALVAGED FLEX HOSE PER 7 <br />©5 EXTEND CONDENSATE PUMP STATION VAULT PER e <br />1 <br />LIJ © INSTALL SALVAGED 18" HDPE BELOW GRADE HEADER, 1 <br />W 2" HDPE COMPRESSED AIR AND CONDENSATE UNES PER ` 1 <br />= Q7 INSTALL SINGLE PIPE SUPPORT PER <br />x 89.4 Co 8 INSTALL 10" x 6' PVC TEE OR SADDLE <br />9 REMOVE/SALVAGE EXISTING CONDENSATE PUMP STATION <br />LIJ 30 INSTALL SALVAGED CONDENSATE PUMP STATION <br />W 31 INSTALL 8' HDPE ELBOW <br />co 3 INSTALL 18" x 8" HDPE SADDLE <br />x 87.5 33 INSTALL 14" x 8' PVC REDUCER <br />34 INSTALL 14" PVC ELBOW (0 FLEX HOSE REDUCER) <br />LIJ 35 INSTALL 8" HDPE FLANGE ADAPTER, BACK-UP RING, & HARDWARE <br />Z 36 INSTALL 8" PVC FLANGE & HARDWARE <br />3 INSTALL SALVAGED 18" PVC FLANGE & HARDWARE <br />.1 38 INSTALL SALVAGED 18" HDPE FLANGE ADAPTER & HARDWARE <br />2 39 INSTALL SALVAGED 18' x 4" HDPE LOW POINT TEE <br />V 40 INSTALL 18" PVC BUND FLANGE & HARDWARE <br />F' 41 INSTALL 6" CSP SLEEVE AT ROAD CROSSING <br />BRYAN A. STIRRAT & ASSOCIATES <br />CONSULTING CIVIL & ENVIRONMENTAL ENGINEERS <br />1360 E. VALLEY VISTA DRIVE <br />DIAMOND BAR, CALIFORNIA 91765 <br />(909) 860-7777 <br />QROFESs,o <br />LEGEND <br />® <br />EXISTING COVANTA ENERGY VERTICAL GAS WELL <br />® <br />EXISTING BELOW GRADE VERTICAL GAS WELL <br />- <br />2" HDPE CONDENSATE CONVEYANCE LINE <br />- - - - <br />2" HDPE COMPRESSED AIR LINE <br />- - - - - - - <br />18" HDPE BELOW GRADE HEADER <br />-1 1 1 1-1.1 1 <br />18" PVC HEADER ON PIPE SUPPORTS <br />- - - - - <br />EXISTING 4" HDPE WELL LATERAL <br />AIAL <br />EXISTING CONDENSATE PUMP STATION <br />N <br />FLEX HOSE <br />LFG CONSTRUCTION NOTES <br />1 PROTECT EXISTING GAS SYSTEM IN-PLACE <br />2 SURVEY LOCATION PRIOR TO FINAL COVER PLACEMENT <br />3 SALVAGE EXISTING WELL MANIFOLD/WELLHEAD ASSEMBLY <br />4 SALVAGE EXISTING 18" PVC HDPE HEADER, 2" HDPE AIR UNE <br />AND CONDENSATE LINES, PPE SUPPORTS, AND FLEX HOSES <br />O INSTAL_ TEMPORARY 4" PVC CAP ON HDPE WELL LATERAL <br />(APPROXIMATELY 2' BELOW GRADE) <br />© INSTALLTEMPORARY 18' PVC CAP ON BELOW GRADE 18' <br />PVCPE HEADER (APPROXIMATELY 2' BELOW GRADE FOR HDPE) <br />Jo.zw IIt9?� t ozw c�? =zw - z CDZz -�� -Tryozw Oz - -- TT T--�T- 7 INSTAL. TEMPORARY 2" CAP ON AIR LINE <br />x 3 _ _ '1 _ �8 INSTALL TEMPORARY 2' CAP ON CONDENSATE UNE <br />x 3 .9 <br />Em- <br />lffj"�g,I <br />IAm■�1'` �• <br />x 91.3 1111111 <br />Illllll <br />1!11111 <br />Illllll <br />1111111 <br />1111111 <br />1111111 <br />IIICII89.3 <br />!111111 <br />Illllll <br />�111f1�� <br />��� VIII ��-,• <br />11111 x 87.1 <br />IIII <br />1111 <br />IIII <br />1111 <br />1111 <br />IIII <br />1111 <br />1111 <br />1j11 x <br />11 I I x 85.5 85.4 <br />1111 <br />1111 <br />1111 <br />1111 <br />I1It <br />ce <br />N0. <br />MCI <br />_x 39.6_ x 39.9 <br />_ _ x 92.5 ------ 111 - x 91.� ------ <br />T I M I JOIN EXISTING LATERAL <br />AT TOP OF SLOPE jlllll11111 <br />I 1 <br />x 90.4 x 90.7 j111111111 <br />11111{1 11111111 <br />_ 1111111 i 1111111 <br />1 �j���j � Iilllll <br />11{1j1 � � � Illllll <br />l i l i Illllll <br />x 88.7 l l l l l l �� 111111 j111111 <br />111111 � 1111111 <br />111111 1111111 <br />1111j1 1111141 <br />111111 Illllll <br />1;111; Illllll <br />I ill mull11111,, x 87.7 l- <br />x 87.5 / 1111 x 87.9 11 11111111 c,87.3 <br />111111 ' - <br />j <br />/ I11j 111111 <br />// 1�1j 111111 <br />/ I{Il 111111 <br />I 111111 <br />/ II��111{1 x 85.2 <br />I VIII <br />1111 � � 11111 <br />IIII �� Hili <br />IIII � � 11111 <br />1111 1{111 <br />1 <br />Y ae x 84.5 11 n 111 - - x 83.9 <br />REVISION DESCRIPTION BY: <br />® z 40.8 _ _ <40.5 �9 INSTALL SALVAGED WELL MANIFOLD PER 5 OR 6 <br />�� _ <br />- - 10 INSTALL 2" SCH 80 PVC PIPE & FITTINGS (LATERAL EXTENSION) <br />:.2� <br />50 MIN 11 INSTALL TEMPORARY WELL LATERAL EXTENSION PER 1 OR 3 <br />1 <br />12 SALVAGE EXISTING ABOVE GRADE GAS HEADER PIPING <br />13 CUT & CAP EXISTING COVANTA VERTICAL WELL CASING 2' BELOW <br />60 GRADE AND SALVAGE WELLHEAD ASSEMBLY <br />14 EXTEND WELL CASING & INSTALL WELLHEAD AFTER FINAL COVER PLACEMENT <br />15 INSTALL AND CONNECT TEMPORARY BELOW GRADE 8" HDPE JUMPER TO <br />EXISTING 18" HDPE HEADER <br />70 16 INSTALL TEMPORARY 2' HDPE AIR LINE JUMPER TO EXISTING AIR LINE <br />17 INSTALL TEMPORARY 2" HDPE CONDENSATE LINE JUMPER TO EXISTING <br />2' CONDENSATE LINE <br />�8 18 INSTALL SALVAGED 18" PVC HEADER, 2" HDPE AIR UNE, q <br />AND 2" HDPE CONDENSATE LINES ON PIPE SUPPORTS PER 4 <br /><blo �k 19 INSTALL SALVAGED WELLHEAD PER 1 OR � 1 <br />90 0 INSTALL/EXTEND 4" HDPE WELL LATERAL PIPING TO HEADER OR MANIFOLD <br />21 ABANDON OR REMOVE TEMPORARY GAS, AIR, & CONDENSATE UNE JUMPERS <br />_ <br />--__o 22 JOIN EXSTING 18" HDPE OR PVC HEADER, 2 HDPE AIR & CONDENSATE LINES <br />- - - - - - <br />- - - r 3 REINSTALL COVANTA GAS SYSTEM ON GRADE <br />® INSTALL SALVAGED FLEX HOSE PER 7 <br />©5 EXTEND CONDENSATE PUMP STATION VAULT PER e <br />1 <br />LIJ © INSTALL SALVAGED 18" HDPE BELOW GRADE HEADER, 1 <br />W 2" HDPE COMPRESSED AIR AND CONDENSATE UNES PER ` 1 <br />= Q7 INSTALL SINGLE PIPE SUPPORT PER <br />x 89.4 Co 8 INSTALL 10" x 6' PVC TEE OR SADDLE <br />9 REMOVE/SALVAGE EXISTING CONDENSATE PUMP STATION <br />LIJ 30 INSTALL SALVAGED CONDENSATE PUMP STATION <br />W 31 INSTALL 8' HDPE ELBOW <br />co 3 INSTALL 18" x 8" HDPE SADDLE <br />x 87.5 33 INSTALL 14" x 8' PVC REDUCER <br />34 INSTALL 14" PVC ELBOW (0 FLEX HOSE REDUCER) <br />LIJ 35 INSTALL 8" HDPE FLANGE ADAPTER, BACK-UP RING, & HARDWARE <br />Z 36 INSTALL 8" PVC FLANGE & HARDWARE <br />3 INSTALL SALVAGED 18" PVC FLANGE & HARDWARE <br />.1 38 INSTALL SALVAGED 18" HDPE FLANGE ADAPTER & HARDWARE <br />2 39 INSTALL SALVAGED 18' x 4" HDPE LOW POINT TEE <br />V 40 INSTALL 18" PVC BUND FLANGE & HARDWARE <br />F' 41 INSTALL 6" CSP SLEEVE AT ROAD CROSSING <br />BRYAN A. STIRRAT & ASSOCIATES <br />CONSULTING CIVIL & ENVIRONMENTAL ENGINEERS <br />1360 E. VALLEY VISTA DRIVE <br />DIAMOND BAR, CALIFORNIA 91765 <br />(909) 860-7777 <br />QROFESs,o <br />FORWARD LANDFILL <br />A. spiF2 <br />FINAL GAS SYSTEM PLAN <br />A <br />STAGE <br />IA PARTIAL <br />FINAL CLOSURE CONSTRUCTION PLANS <br />No. 22631 <br />Exp. 12-31-05 <br />DESIGNED BY <br />R.M.G. <br />SCALE AS SHOWN <br />DRAWN BY : <br />M.T.B./C.A.L. <br />DATE 06-05 FILE NO.: 86307DB <br />s� IV11 <br />�q <br />CHECKED BY <br />R.M.G. <br />DATE 06-05 <br />DATE 06-05 SHEET G9 OF 26 <br />APPROVED BY : B.A.S. <br />