My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_6
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2005_6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:41:08 AM
Creation date
7/3/2020 10:50:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_6
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2005_6.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.2 PHOTO DOCUMENTATION <br /> The Construction Manager shall prepare a photographic record as part of the construction <br /> control activities. Photographs shall be in color and shall include photographs of <br /> construction activities, problem areas, corrective actions, and final constructed features. <br /> Photographs shall be identified with the site designation, the date taken, the location, and <br /> a description of the activity covered by the photograph. <br /> 7.3 AS-BUILT DOCUMENTATION <br /> As the work is completed, final Record Drawings and a report shall be prepared under the <br /> direction of the Engineer and Construction Manager utilizing the record prepared during <br /> construction. These drawings and the report shall be retained as a permanent record of <br /> construction. The report shall include a laboratory test results summary and discuss <br /> typical construction conditions and procedures. The Record Drawings and report will be <br /> submitted to the Owner. The Contractor shall submit all "As-Built" information to the <br /> Owner as required by the Project Plans and Specifications. <br /> -16- <br /> C"U003-033%EDOMHH,LCQAPLAN.DOC <br /> Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.