My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_6
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2005_6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:41:08 AM
Creation date
7/3/2020 10:50:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_6
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2005_6.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ Differential settlement due to variable composition of the refuse fill. <br /> ■ Differential settlement due to voids. <br /> Settlement during the post-closure period is primarily due to decomposition of the refuse. <br /> Settlement rates for southern California landfills have been measured in rates of approximately <br /> 117o per year(2)for approximately ten year old refuse. Generally landfill data shows that the rate <br /> of settlement decreases with time. <br /> For the post-closure settlement analysis, it is assumed that the landfill will exhibit an average <br /> settlement of 25% over the 30-year post-closure period. The critical area for analysis is assumed <br /> to be the minimum grade closure slopes toward the center of the landfill. For the Austin Road <br /> Landfill Expansion, the proposed minimum closure grade is 5%. For this analysis, the <br /> minimum refuse depth is assumed to be 100 feet. <br /> The effects of the varying depth of waste on settlement and final post-closure landfill grade <br /> was evaluated by assuming that the landfill has a consistent total settlement of 257o in all areas <br /> and depths of the refuse fill. This results in a decrease in the final grade. For example, 25% <br /> settlement of 100 feet of refuse results in a final depth of 75 feet and 25% settlement of ev feet <br /> of refuse results in a final depth of 82.5 feet. For a 5% slope, this means that the elevation <br /> difference over 200 horizontal feet changes from 10 feet to 7.5 feet, resulting in a grade change <br /> from 576' to 3.75% (see Calculation No. 1). <br /> Differential settlement due to variable composition of the refuse was analyzed by assuming a <br /> 3-dimensional array of landfill cells would have a range of random settlement values between <br /> 22% to 289o' (see attached Calculation No. 2). Figure 3 shows a representative cross-section for <br /> differential settlement from the analysis. Based on this range of settlement, the original 5% <br /> constant slope would vary from approximately 196' to 6%. <br /> If a greater range of settlement is assumed, then the localized ponding could occur. However, <br /> based on the analysis in Section 3.3 below, the geomembrane is expected to maintain its <br /> integrity and continue to act as a moisture barrier between the cover soil and the refuse. <br /> Periodic inspections for ponding conditions during the post-closure period should be <br /> conducted. Areas showing evidence of ponding should be filled as required to maintain the <br /> proper site drainage. <br /> The third analysis is differential settlement due to formation of a void within the refuse fill. A <br /> theoretical void condition is the decomposition of a large appliance such as a refrigerator and <br /> the subsequent local collapse of the fill under the cover. Jang and Montero(3) analyzed this <br /> condition using an elastic analysis method to predict the degree of subsidence and strain <br /> relative to the depth of the void. The analysis was conducted for a liner system used in a <br /> vertical expansion,but the results are also applicable to a final cover system. <br /> WW-1811-CAI-AA/3110 <br /> Austin Road Landfill Expansion August 2,1995 <br /> NtLI033.DOC Landfill Settlement Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.