Laserfiche WebLink
Leachate quantity and quality will be monitored at least quarterly or whenever <br /> groundwater samples are collected. The volume of leachate collected by the <br /> french drain shall be measured and recorded at least quarterly. Representative <br /> samples of leachate and any fluid recovered in the french drain system will be <br /> tested for the same chemical parameters as required by the groundwater <br /> monitoring program. Reports will be filed with the LEA, CIWMB and the RWQCB <br /> within 90 days of sampling. <br /> 4.6 BENCH MAINTENANCE <br /> The bench will require general maintenance. After a significant storm event and <br /> on a quarterly basis, the bench will be inspected to determine if any potholing, <br /> erosion and/or structural damage has occurred. If any deficiencies are noted, <br /> the affected area will be repaired. <br /> 4.7 LANDFILL SETTLEMENT MONITORING AND MONUMENT MAINTENANCE <br /> 4.7.1 SURVEY RECORD <br /> Regulatory requirements dictate that, upon completion of closure construction <br /> activities, a survey record of the closed landfill be established and recorded with <br /> the title of the property, with the County Recorders office and copies be made <br /> available to the CIWMB, LEA and kept on-site at the administration offices. The <br /> survey of record will include the following information: <br /> • The date closure construction was completed; <br /> • Boundaries of the disposal area; <br /> • The location and telephone number of where the closure and post-closure <br /> plans can be obtained; and <br /> • A statement that the future site use is restricted in accordance with the post- <br /> closure maintenance plan. <br /> 4.7.2 SURVEY SETTLEMENT MONUMENTS <br /> In accordance with 27 CCR, Section 20950 (d), survey/settlement monuments <br /> are to be established at the landfill so that facilities constructed during closure <br /> can be located and controls can be provided from which to monitor future <br /> Forward Landfill PFCPCMP 4-3 <br /> J:\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec4.doc:6/9/2005 <br />