Laserfiche WebLink
JOINT TECHNICAL DOCUMENT <br /> FOR THE <br /> FORWARD LANDFILL <br /> TABLE OF CONTENTS <br /> APPENDICES <br /> A Permits <br /> B Groundwater Wells within One Mile <br /> C Site Capacity Calculations <br /> C-1 Beneficial Reuse Calculations <br /> D HELP Model Results <br /> E Slope Stability Analysis <br /> F Settlement Analysis <br /> G Hydrology <br /> H Landfill Gas Generation Rates <br /> I Soil Loss Analysis <br /> J Site Health and Safety Program <br /> K Load Checking Program <br /> L Preliminary Closure and Post-Closure Maintenance Plan <br /> M ADC and ACW Recording Forms <br /> Forward Landfill JTD ix <br /> J:\Allied\Forward\JTD Amendment\March 2006 JTD-LEA Resp\JTD\T0C.doc:T0C:5/24/02 <br /> Rev. 1:7/2002;Rev.2:4/2003;Rev.3:6/2003 BRYAN A.STIRRAT 6 ASSOCIATES <br /> Amendment No. 1: 5/22/2006 <br />