Laserfiche WebLink
4.1.2 CURRENT RESOURCE RECOVERY ACTIVITIES <br /> Salvaging, volume reduction, and recycling activities were conducted at the <br /> transfer station located in the area of the existing Forward Landfill, south of the <br /> South Branch. The transfer station building is currently utilized for transfer (i.e., <br /> unloading of packer trucks and loading onto transfer trailers) of recycled <br /> material. <br /> 4.1.3 EXISTING STORAGE AND SUPPORT FACILITIES <br /> The support facilities consist of an entrance facilities area, scales and scale <br /> houses, water production wells, maintenance and storage area, a transfer <br /> station/resource recovery building, landfill gas recovery plant, a groundwater <br /> treatment plant, and sedimentation/detention ponds. <br /> The entrance facilities area includes two office trailers, portable sanitary facilities, <br /> a landscaped area, and gravel and paved parking areas for employees and <br /> visitors. The main site office is located in the entrance facility. <br /> Two scale houses are located at the site. The main scale house for the existing <br /> Forward Landfill has four scales and is located in the northwest corner of the <br /> existing Forward Landfill site. The secondary scale house has one scale and is <br /> located at the northeast corner of the existing Austin Road Landfill. Incoming <br /> waste loads are monitored at the scale houses and all vehicular activities are <br /> regulated in accordance with the established Load Checking Program. An <br /> additional scale is located in the southern portion of the existing Forward Landfill <br /> to service the composting operations. <br /> Two water supply wells and one water supply standpipe are located at the <br /> existing Forward Landfill and one water supply well is located at the existing <br /> Austin Road Landfill. The water supply standpipe is located adjacent to the <br /> Forward scalehouse. The water production well that supplies the standpipe is <br /> located near the main entrance facility for the existing Forward Landfill. The well <br /> has a production of approximately 1,500 gallons per minute (gpm). The other <br /> water supply well at the existing Forward Landfill is located south of the South <br /> Branch and has a capacity of 500 gpm. The water supply well at the existing <br /> Austin Road Landfill is located along the northern boundary of the existing landfill. <br /> This well was installed in 1972 and has a production of approximately 60 gpm. <br /> Forward Landfill JTD 4-4 <br /> J:\Allied\Forward\ITD Amendment\March 2006 JTD-LEA Resp\JTDUTD Sec 4 Final.doc: BRYAN A.STIRRAT&ASSOCIATES <br /> 05/24/02;Amendment No.1: 5/19/2006 <br />