Laserfiche WebLink
r <br /> emergency response (including a separate section on ACM) and evacuation <br /> procedures are identified in the Emergency Response Plan (discussed in Section <br /> 8.3 and included in Appendix J). <br /> In addition to the equipment and systems mentioned above, the following <br /> emergency equipment is maintained at the site at all times: <br /> • Industrial first-aid kits located in the landfill office trailer, transfer station <br /> office, and maintenance area; <br /> • Personal protective equipment; <br /> • Disposable respirators; <br /> • Gloves; <br /> • Hard hats; <br /> • Safety glasses; <br /> • Chemical-resistant coveralls; <br /> • Hearing protection; <br /> • Specialized equipment, as necessary, depending on the activities and area <br /> being worked in (such as respirators for ACM); <br /> • Portable eyewash located in the locker area of the maintenance area; <br /> • Decontamination shower located in the maintenance area with a 250-gallon <br /> capacity; and <br /> • 4 Honda pumps. <br /> Forward Landfill JTD 6-32 <br /> ):\Allied\Forward\JTD Amendment\March 2006 JTD-LEA Resp\JTD\)TD Sec 6 Rev.doc: <br /> 5/22/02;Rev.1:7/2002:Rev.2:4/2003;Rev 3:6/2003;Amendment No.1:5/22/2006 <br />