Laserfiche WebLink
Project Name: (cr CI o s c_i-z <br />Project No: 02- t 6 0I ,&G <br />MOISTURE -DENSITY SUMMARY <br />Review by: <br />*)R <br />VNGINEERING INC. <br />Test Date <br />5 -Oct -05 <br />Test Location <br />Test No. Northing Easting Elevation <br />or or or <br />Grid No. Grid No. Lift No. <br />501 N. sloe <br />Soil Information <br />Sample DD max Optimum <br />No (pct) Moisture <br />% <br />CL -11 115.0 14.2 <br />Field Testing <br />Wet Moisture <br />Density Content <br />% <br />121.9 13.2 <br />Information <br />Dry <br />Density <br />107.7 <br />% <br />Comp <br />93.7 <br />Specification <br />% Moisture <br />Comp Content <br />90 -2 to +2 <br />PIF <br />P <br />Remarks/retest <br />5 -Oct -05 <br />502 N. sloe <br />CL -11 <br />115.0 <br />14.2 <br />123.3 <br />13.6 <br />108.5 <br />94.3 <br />90 -2 to +2 <br />P <br />5 -Oct -05 <br />503 N. sloe <br />CL -11 <br />115.01 <br />14.2 <br />123.4 <br />13.8 <br />108.41 <br />94.3 <br />901-2 to +2 <br />P <br />5 -Oct -05 <br />504 N. slope I <br />CL -11 <br />115.0 <br />14.2 <br />123.8 <br />13.3 <br />109.3 <br />95.0 <br />90 -2 to +2 <br />P <br />SC -50 <br />5 -Oct -05 <br />505 N. sloe <br />CL -11 <br />115.0 <br />14.2 <br />124.9 <br />14.4 <br />109.2 <br />95.0 <br />90 -2 to +2 <br />P <br />5 -Oct -05 <br />506 N. sloe <br />CL -11 <br />115.0 <br />14.2 <br />124.2 <br />14.7 <br />108.3 <br />94.2 <br />90 -2 to +2 <br />P <br />5 -Oct -051 <br />507 N. sloe <br />CL -11 <br />115.0 <br />14.2 <br />124.3 <br />14.9 <br />108.2 <br />94.1 <br />90 -2 to +2 <br />P <br />5 -Oct -05 <br />508 N. slope <br />CL -11 <br />115.0 <br />14.2 <br />125.41 <br />14.8 <br />109.2 <br />95.0 <br />90 -2 to +2 <br />P <br />5 -Oct -05 <br />509 N. sloe <br />CL -11 <br />115.01 <br />14.2 <br />124.5 <br />15.9 <br />107.41 <br />93.4 <br />901-2 to +2 <br />P <br />6-0ct-05 <br />510 N. sloe <br />CL -11 <br />115.0 <br />14.2 <br />122.2 <br />14.4 <br />106.8 <br />92.9 <br />90 -2 to +2 <br />P <br />6 -Oct -05 <br />511 N. slope <br />CL -11 <br />115.0 <br />14.2 <br />124.1 <br />14.5 <br />108.4 <br />94.3 <br />90 -2 to +2 <br />P <br />6 -Oct -05 <br />512 N. sloe <br />CL -11 <br />115.0 <br />14.2 <br />125.1 <br />15.6 <br />108.2 <br />94.1 <br />90 -2 to +2 <br />P <br />6 -Oct -051 <br />513 N. sloe <br />CL -11 <br />115.0 <br />14.2 <br />126.1 <br />15.3 <br />109.4 <br />95.1 <br />90 -2 to +2 <br />P <br />6 -Oct -05 <br />514 N. sloe <br />CL -11 <br />115.0 <br />14.2 <br />125.4 <br />15.8 <br />108.3 <br />94.2 <br />90 -2 to +2 <br />P <br />SC -51 <br />6-0ct-05 <br />515 N. sloe <br />CL -11 <br />115.01 <br />14.2 <br />126.5 <br />15.5 <br />109.5 <br />95.2 <br />901-2 to +2 <br />P <br />6 -Oct -05 <br />516 N. slope I <br />CL -11 <br />115.0 <br />14.2 <br />123.7 <br />16.0 <br />106.6 <br />92.7 <br />90 -2 to +2 <br />P <br />6 -Oct -05 <br />517 N. slope <br />CL -11 <br />115.0 <br />14.2 <br />127.8 <br />15.8 <br />110.4 <br />96.0 <br />90 -2 to +2 <br />P <br />6 -Oct -05 <br />518 N. sloe <br />CL -11 <br />115.0 <br />14.2 <br />125.7 <br />15.7 <br />108.6 <br />94.4 <br />90 -2 to +2 <br />P <br />6 -Oct -051 <br />519 N. slope <br />CL -11 <br />115.0 <br />14.2 <br />120.5 <br />14.2 <br />105.5 <br />91.7 <br />90 -2 to +2 <br />P <br />6 -Oct -05 <br />520 N. sloe <br />CL -11 <br />115.0 <br />14.2 <br />123.5 <br />13.7 <br />108.61 <br />94.4 <br />90 -2 to +2 <br />P <br />6 -Oct -05 <br />521 N. sloe <br />CL -11 <br />115.01 <br />14.2 <br />124.5 <br />13.9 <br />109.3 <br />95.0 <br />901-2 to +2 <br />P <br />6 -Oct -05 <br />522 N. slope <br />CL -11 <br />115.0 <br />14.2 <br />123.1 <br />14.1 <br />107.9 <br />93.8 <br />901-2 to +2 <br />P <br />6 -Oct -05 <br />523 N. slope <br />CL -11 <br />115.0 <br />14.2 <br />128.8 <br />15.9 <br />111.1 <br />96.6 <br />90 -2 to +2 <br />P <br />6 -Oct -05 <br />524 N. slope <br />CL -11 <br />115.0 <br />14.2 <br />128.1 <br />15.9 <br />110.5 <br />96.1 <br />90 -2 to +2 <br />P <br />SC -52 <br />6 -Oct -05 <br />525 N. slope <br />CL -11 <br />115.0 <br />14.2 <br />126.8 <br />15.6 <br />109.7 <br />95.4 <br />90 -2 to +2 <br />P <br />4/23/03, Rev. 0 Page 21 of - <br />