Laserfiche WebLink
C <br />Project Name: has e �s� *� �/� close <br />Project No: 0z /6 ci16-1 0 6 <br />C7 <br />MOISTURE -DENSITY SUMMARY <br />Review by: <br />V�R <br />NGINEERING INC. <br />Test Date <br />13 -Oct -05 <br />Test Location <br />Test No. Northing Easting Elevation <br />or or or <br />Grid No. Grid No. Lift No. <br />601 N. sloe <br />Soil Information <br />Sample DD m,, Optimum <br />No (pco Moisture <br />CL -12 116.8 14.6 <br />Field Testing <br />Wet Moisture <br />Density Content <br />122.4 14.8 <br />Information <br />Dry <br />Density <br />106.6 <br />% <br />Comp <br />91.3 <br />Specification <br />% Moisture <br />Comp Content <br />90 -2 to +2 <br />PIF Remarks/retest <br />P <br />13 -Oct -051 <br />602 N. sloe I <br />CL -12 <br />116.81 <br />14.6 <br />125.8 <br />14.7 <br />109.71 <br />93.9 <br />90 -2 to +2 <br />P <br />13 -Oct -05 <br />603 N. slope <br />CL -12 <br />116.8 <br />14.6 <br />124.7 <br />14.9 <br />108.5 <br />92.9 <br />901-2 to +2 <br />P <br />13 -Oct -05 <br />604 N. slope <br />CL -12 <br />116.8 <br />14.6 <br />128.1 <br />15.1 <br />111.3 <br />95.3 <br />90 -2 to +2 <br />P SC -60 <br />13 -Oct -05 <br />605 N. slope <br />CL -12 <br />116.8 <br />14.6 <br />127.1 <br />15.2 <br />110.3 <br />94.4 <br />90 -2 to +2 <br />P <br />13 -Oct -05 <br />606 N. slope <br />CL -12 <br />116.8 <br />14.6 <br />129.8 <br />15.5 <br />112.3 <br />96.2 <br />90 -2 to +2 <br />P <br />13-OCt-051 <br />607 N. slope <br />CL -12 <br />116.8 <br />14.6 <br />130.5 <br />15.3 <br />113.2 <br />96.9 <br />90 -2 to +2 <br />P <br />13 -Oct -05 <br />608 N. sloe <br />CL -12 <br />116.81 <br />14.6 <br />129.0 <br />15.9 <br />111.3 <br />95.3 <br />90 -2 to +2 <br />P <br />13 -Oct -05 <br />609 N. slope <br />CL -12 <br />116.8 <br />14.6 <br />127.8 <br />15.8 <br />110.4 <br />94.5 <br />901-2 to +2 <br />P <br />13 -Oct -05 <br />610 N. sloe <br />CL -12 <br />116.8 <br />14.6 <br />127.2 <br />16.2 <br />109.5 <br />93.8 <br />90 -2 to +2 <br />P <br />13 -Oct -05 <br />611 N. sloe <br />CL -12 <br />116.8 <br />14.6 <br />127.6 <br />16.1 <br />109.9 <br />94.1 <br />90 -2 to +2 <br />P <br />13 -Oct -051 <br />612 N. sloe <br />CL -12 <br />116.8 <br />14.6 <br />126.4 <br />16.4 <br />108.6 <br />93.0 <br />90 -2 to +2 <br />P <br />13 -Oct -05 <br />613 N. sloe I <br />CL -12 <br />116.8 <br />14.6 <br />128.6 <br />16.6 <br />110.31 <br />94.4 <br />90 -2 to +2 <br />P <br />13 -Oct -05 <br />614 N. sloe <br />CL -12 1 <br />116.8 <br />14.6 <br />129.3 <br />16.2 <br />111.3 <br />95.3 <br />90 -2 to +2 <br />P <br />13 -Oct -05 <br />615 N. sloe <br />CL -12 <br />116.8 <br />14.6 <br />127.1 <br />15.9 <br />109.7 <br />93.9 <br />901-2 to +2 <br />P <br />13 -Oct -05 <br />616 N. slo a <br />CL -12 <br />116.8 <br />14.6 <br />126.9 <br />15.8 <br />109.6 <br />93.8 <br />90 -2 to +2 <br />P <br />13 -Oct -05 <br />617 N. sloe <br />CL -12 <br />116.8 <br />14.6 <br />125.7 <br />16.2 <br />108.2 <br />92.6 <br />90 -2 to +2 <br />P <br />13 -Oct -05 <br />618 N. slope <br />CL -12 <br />116.8 <br />14.6 <br />131.8 <br />16.4 <br />113.2 <br />96.9 <br />90 -2 to +2 <br />P SC -61 <br />13 -Oct -05 <br />619 N. sloe <br />CL -12 <br />116.81 <br />14.6 <br />131.0 <br />16.3 <br />112.6 <br />96.4 <br />90 -2 to +2 <br />P <br />13 -Oct -05 <br />620 N. sloe I <br />CL -12 <br />116.8 <br />14.6 <br />131.3 <br />16.5 <br />112.71 <br />96.5 <br />90 -2 to +2 <br />P <br />13 -Oct -05 <br />621 N. slope <br />CL -12 <br />116.8 <br />14.6 <br />131.2 <br />15.9 <br />113.2 <br />96.9 <br />901-2 to +2 <br />P <br />13 -Oct -05 <br />622 N. slope <br />CL -12 <br />116.8 <br />14.6 <br />130.5 <br />16.3 <br />112.2 <br />96.1 <br />90 -2 to +2 <br />P <br />13 -Oct -05 <br />623 N. slope <br />CL -12 <br />116.8 <br />14.6 <br />129.4 <br />16.5 <br />111.1 <br />95.1 <br />90 -2 to +2 <br />P <br />13 -Oct -05 <br />624 N. slope <br />CL -12 <br />116.8 <br />14.6 <br />130.2 <br />14.9 <br />113.3 <br />97.0 <br />90 -2 to +2 <br />P <br />14 -Oct -05 <br />625 N. slope <br />CL -12 <br />116.8 <br />14.6 <br />125.6 <br />15.8 <br />108.5 <br />92.9 <br />90-2 to +2 <br />P <br />4/23/03, Rev. 0 Page .2,5 of <br />