Laserfiche WebLink
VECTOR <br />ENGlNEERlNG, /NC <br />0 <br />DAILY CONSTRUCTION FIELDT. • s r ... <br />Project Name: <br />Forward Landfill Closure <br />Project No. <br />021605.06 <br />Daily Field Report Sequence Number: <br />1 <br />Location of Work: <br />Manteca, Ca <br />Client Or Manager <br />Ruben Ramirez <br />Date: Day of The Week: <br />Aust 18, 2005 Thursday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Larry Simms <br />Source and Description of Fill Material <br />Weather: <br />CQA Technician: <br />Hot, clear and breezyto wind <br />Ken Davila <br />Equipment ite• <br />on s <br />2 -She! sfoot com actors, 2- water trucks, 1- D6 dozer, 4-627 scrapers.., <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />At the request of the client, I arrived on site today for observations and documentation at the location <br />listed above. Guinn Construction had completed clearing and grubbing of the west slope of the existing <br />trash and were working on the north slope at the time of my arrival. The scrapers were removing topsoil <br />from the area north of the North Fork of South Little John's Creek and stockpiling it to the east of the cut <br />*work <br />area. A brief meeting was held in the early morning with the foreman to discuss pipe layout and locations, <br />schedule and plans. <br />The surveyor and leak location personnel worked on the FU -05 cell floor. <br />M <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Reviewed By: ,ItC <br />