My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_15
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 10:51:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_15
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_15.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIGNATURE PAGE <br /> Vector Engineering, Inc. (Vector) provided construction quality assurance <br /> services during the construction of the Stage lA Partial Final Closure at the <br /> Forward Landfill. The following final construction certification report was <br /> prepared by Vector and is hereby submitted to the Regional Water Quality <br /> Control Board (RWQCB). <br /> This report was prepared in accordance with generally accepted geotechnical <br /> and geosynthetic engineering practices applicable at the time the report was <br /> prepared. Vector makes no other warranties, either expressed or implied, as to <br /> the professional advice provided under the terms of this agreement, and as <br /> described in this report. Our recommendations consist of professional <br /> opinions and conclusions based on our testing and inspection program <br /> performed during construction. <br /> The purpose of this report is to inform the RWQCB that, in our professional <br /> opinion, the Stage lA Partial Final Closure at the Forward Landfill has been <br /> constructed and completed in general accordance with the project plans and <br /> specifications. During the construction, Vector conducted observations and <br /> testing to determine that the construction was conducted in general <br /> accordance with the project plans and specifications. The conclusions of our <br /> observations and testing, together with a written narrative describing the <br /> personnel, scope, methods, procedures and results of our CQA services, have <br /> been included in this certification report. <br /> VECTOR ENGINEERING INC. Q� Ek <br /> Monte A. Christie, PE, GE w G <br /> No C58866 Ca gyp } <br /> CQA Engineer it <br /> q ®F CA1., <br />
The URL can be used to link to this page
Your browser does not support the video tag.