Laserfiche WebLink
11'rECTOR <br />ENGINEERING, INC. <br />0 DAILY <br />CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward Landfill Closure <br />021605.06 <br />29 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, Ca <br />Ruben Ramirez <br />Se tember 27, 2005 <br />1 Tuesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />BAS <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Larry Simms <br />Source and Description of Fill Material <br />Weather: <br />CQA Technician: <br />On site native brown silty Clay <br />Warm to hot, clear and bre e <br />Ken Davila <br />Equipment on site: <br />1-Shee2sfoot roller, 2 -water trucks, 2-D6 dozers, 8-627 scrapers, 1-140 blade, 1 -John Deere with discs (down late AlV>7 <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I arrived on site today for observations and documentation at the job location listed above. Guinn <br />Construction continued using the scrapers to haul clay from the northern cut area throughout the day. One <br />dozer, one of the water trucks and the sheepsfoot roller also worked on the north slope fill area. The other <br />water truck moisture conditioned the haul roads and the cut area behind the tractor with discs. The disc <br />® tractor broke down in the late morning and was placed out of service until repairs can be made. GSE was <br />Informed that their services would be required as soon as they could make it to the site. After an early <br />morning phone call to GSE, they stated that, as of today, either this Saturday or Monday would be the <br />earliest they could be on site. <br />Fifteen (18) nuclear moisture density tests were performed at random locations and elevations on the north <br />slope fill area. All tests passed the specified values in density and moisture content and the on site foreman <br />was verbally informed of the test results. <br />The pipe crew arrived on site and began the relocation of the gas pipeline at the toe of slope. <br />Reviewed By: 19C <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />