Laserfiche WebLink
9 <br /> WEEKLYIMONTHLY MAINTENANCE CHECKLIST <br /> CHECKED COMMENTS <br /> 1, COCK VALVES -CONDITION&WORKABILITY <br /> 2. CONTROL VALVES -CONDITION &WORKABILITY <br /> 3, FLEXIBLE COUPLINGS - CONDITION & <br /> WORKABILITY <br /> 4. CONDENSATE TRAPS -CONDITION & <br /> WORKABILITY <br /> 5. BLOWER STATION -CLEANLINESS & SECURITY <br /> B, BLOWER ASSEMBLY- BELTS, GREASE, PARTICU- <br /> LATE BUILD-UP, ETC. <br /> 7. BLOWER STATION - PIPING, VALVES, FLAMES <br /> ARRESTERS, & FLARE WORKABILITY, LEAK CHECK <br /> 8, SITE SURFACE- SETTLEMENT, PONDER WATER, / <br /> CRACKS, EROSION <br /> 9. VALVES & WELL HEADS - CONDITION & <br /> WORKABILITY <br /> 10_ ELECTRICAL -VISUAL & OPERATIONAL <br /> 11, RESTART - CHECK RESTART SYSTEMIFIREYE <br /> OPERATION <br /> 12. ALARM-CONDITIONISIMULATE DIALER SYSTEMS/ <br /> SOUTH BAY ALARM �}�p�� J p� <br /> 13. TEMPERATURE CHART-CONDITION & <br /> WORKABILITY(E.G., SPEED, ETC.) <br /> 14, PROPANE - VOLUME, SPARE 1 <br /> 15, SJAQMD QUARTERLY LEAK TESTING <br /> 16, COMPRESSOR -FILTERS, OIL, PRESSURE DSL <br /> REMARKS <br /> CONDUCTED BY: DATE: �1 <br /> REVIEWED BY: DATE: �/ GI/ <br />