My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_23
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_23
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_23.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
762
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-06 November 2006 <br /> Forward Landfill Project No.021605.07 <br /> Monitor performed sieve analysis tests on five (5) samples of the granular drainage <br /> gravel. In addition, Vector CQA Monitor performed sieve analysis on one (1) sample <br /> of the coarse gravel fill. <br /> The results of LCRS granular drainage material sieve analyses indicated 100% <br /> passing the 3/8-inch sieve and less than 3% passing the No. 200 sieve. The results of <br /> the coarse gravel sieve analyses indicated 100% passing the 1-inch sieve, maximum <br /> 15% passing the 1/2-inch sieve, maximum 5% passing the No. 4 sieve and maximum <br /> 2% passing the No. 200 sieve. <br /> Hydraulic conductivity testing of the granular drainage material indicated an <br /> average flow rate of 1.0 cm/sec, which exceeds the requirement of 0.1 cm/sec. <br /> Hydraulic conductivity testing of the coarse granular drainage material indicated <br /> an average flow rate of>1.0 cm/sec, which exceeds the requirement of 1 cm/sec. <br /> A summary of the laboratory testing conducted on the granular drainage layer and <br /> the coarse gravel are presented in Tables 5 and 6, respectively. The laboratory test <br /> results of the granular drainage gravel and coarse gravel testing to date are <br /> included in Appendix F and Appendix G, respectively. <br /> TABLE 5 <br /> GRANULAR DRAINAGE MATERIAL LABORATORY TESTING SUMMARY <br /> Specifications 100% <3% >0.1 cm/sec <br /> FG-2 3/8" Pea Gravel 100 0.5 0.28 <br /> FG-3 3/8" Pea Gravel 100 1.0 11 <br /> FG-4 3/8" Pea Gravel 100 1.1 8.3 <br /> FG-5 3/8" Pea Gravel 100 1.1 9.3 <br /> FG-6 1 3/8" Pea Gravel 1 100 1 0.4 1 7.2 <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -18- <br />
The URL can be used to link to this page
Your browser does not support the video tag.