Laserfiche WebLink
SIGNATURE PAGE <br /> • Vector Engineering, Inc. (Vector) provided construction quality assurance services <br /> during the construction of WMU FU-06, at the Forward Landfill. The following final <br /> construction certification report was prepared by Vector and is hereby submitted to <br /> the Regional Water Quality Control Board (RWQCB). <br /> This report was prepared in accordance with generally accepted geotechnical and <br /> geosynthetic engineering practices applicable at the time the report was prepared. <br /> Vector makes no other warranties, either expressed or implied, as to the <br /> professional advice provided under the terms of this agreement, and as described in <br /> this report. Our recommendations consist of professional opinions and conclusions <br /> based on our testing and inspection program performed during construction. <br /> The purpose of this report is to inform the RWQCB that, in our professional opinion, <br /> the WMU FU-06 liner system at the Forward Landfill has been constructed and <br /> • completed in general accordance with the project plans and specifications. During <br /> the construction, Vector conducted observations and testing to determine that the <br /> construction was conducted in general accordance with the project plans and <br /> specifications. The conclusions of our observations and testing, together with a <br /> written narrative describing the personnel, scope, methods, procedures and results <br /> of our CQA services, have been included in this certification report. <br /> VECTOR ENGINEERING INC. <br /> Q�pFESS1p,y,�l <br /> C2 �No.058866 '� <br /> Monte A. Christie, PE, GE GE- 67 <br /> No C58866 <br /> CQA Engineer &.2, �o�c ,{,�Q' <br /> OF C <br /> • <br />