|
YZECTOR
<br />ENGINEERING, INC.
<br />GEOMEMBRANE REPAIR LOG
<br />Project Name: Forwartd WMU FU -06 Material Type: 60 -mil HDPE dst
<br />Project No.: 02.1605.07 [x] Primary [ ] Secondary [ ] Other
<br />Repair
<br />#
<br />Seam/
<br />Panel
<br />Location
<br />Description
<br />REPAIR
<br />TEST
<br />Date
<br />2006
<br />Equip #
<br />Operator
<br />Date
<br />2006
<br />Type*
<br />Pass/
<br />Fail
<br />COA
<br />Monitor
<br />97
<br />1 38,63,65
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />98
<br />34,38,65
<br />floor
<br />T
<br />9/9
<br />1264
<br />1 AS
<br />9/9
<br />VT
<br />Pass
<br />JLS
<br />99
<br />34,65,67
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />100
<br />34,35,67
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />101
<br />35,67,69
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />102
<br />35,36,69
<br />floor
<br />T
<br />9/9
<br />1264
<br />1 AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />103
<br />36,69,71
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />104
<br />36,37,71
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />105
<br />37,71,74
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />106
<br />37,40,74
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />107
<br />40,74,76
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />108
<br />40,41,76
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />109
<br />41,76,78
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />110
<br />41,42,78
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />111
<br />42,43,80
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />112
<br />42,43,80
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />113
<br />43,80,82
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />114
<br />43,44,82
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />I Pass
<br />JLS
<br />115
<br />44,45,82
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />116
<br />1,2,64
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/9
<br />VT
<br />Pass
<br />JLS
<br />117
<br />2,64,66
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/9
<br />VT
<br />Pass
<br />JLS
<br />118
<br />2,3,66
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/9
<br />VT
<br />Pass
<br />JLS
<br />119
<br />3,66,68
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/9
<br />VT
<br />Pass
<br />JLS
<br />120
<br />3,4,68
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/9
<br />VT
<br />Pass
<br />JLS
<br />121
<br />4,68,70
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/9
<br />VT
<br />Pass
<br />JLS
<br />122
<br />4,5,70
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/9
<br />VT I
<br />Pass
<br />JLS
<br />123
<br />5,70,73
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/9
<br />VT
<br />Pass
<br />JLS
<br />124
<br />5,6,73
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/9
<br />VT
<br />Pass
<br />JLS
<br />125
<br />6,73,75
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/9
<br />VT
<br />Pass
<br />JLS
<br />126
<br />7,75,77
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/9
<br />VT
<br />Pass
<br />JLS
<br />127
<br />7,8,77
<br />floor
<br />T
<br />9/9
<br />1264
<br />AS
<br />9/9
<br />VT
<br />Pass
<br />JLS
<br />128
<br />8,77,79
<br />floor
<br />T
<br />9/11
<br />1264
<br />AS
<br />9/9 1
<br />Vf
<br />Pass
<br />JLS
<br />EXT = existing liner at previous termination
<br />*VT-VACCUM TEST
<br />SP - SPARK TEST
<br />AL -AIR LANCE
<br />REVIEWED BY:
<br />4/23/03, Rev. 0
<br />G-6 Page 4 of 10
<br />r�
<br />
|